My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
2000 AGN MAY 16 I13
Colton
>
CITY CLERK
>
City Council Agendas
>
Agenda Packets
>
2000 - 2009
>
2000
>
2000 May 16 Agenda Packet
>
2000 AGN MAY 16 I13
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/25/2014 4:15:54 PM
Creation date
2/20/2014 2:09:24 PM
Metadata
Fields
Template:
General Documents
Created By
avillalba
DocType
Agendas
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF COLTON <br />AGENDA REPORT <br />For the Council Meeting of May 16, 2000 <br />TO: HONORABLE MAYOR AND CITY COUIL/ <br />APPROVAL: HENRY T. GARCIA, CITY MANAGER �" <br />FROM: THOMAS K. CLARKE, UTILITY DIRECTOR <br />SUBJECT: AWARD OF CONTRACT TO MATICH CORP. IN THE AMOUNT OF $133,894.40 FOR THE <br />STORMWATER MISSING LINK PROJECT <br />DATE: MAY 1, 2000 <br />BACKGROUND: <br />The FY99-00 Stormwater Capital Improvement budget included funds for the installation of curb, gutter and <br />sidewalk at the following locations: <br />1. West Johnston Street <br />2. West Mill Street <br />3. Olive Place <br />4. South Seventh Street <br />5. South Eight Street <br />6. Washington Street <br />A total of 1,334 feet of curb and gutter and 2,425.6 feet of sidewalk will be installed. <br />The FY00-01 Stormwater Capital Improvement budget includes funds for the installation of curb, gutter and <br />sidewalk at the following locations: <br />1. Pepper Avenue 4. Walin Street <br />2. Pennsylvania Avenue 5. Hert Street <br />3. Orangewood Street] <br />A total of 1,735 feet of curb, gutter and sidewalk will be installed next fiscal year. <br />DISCUSSION: <br />On May 1, 2000 staff received and opened two bids for the missing link project. The results are as follows: <br />1. Matich Corp. $133,894.40 <br />2. Malton Construction $142,830.94 <br />ENVIRONMENTAL IMPACT: <br />The installation of curb, gutter and sidewalk in the designated areas will prevent earth from entering into the <br />stormwater runoff and flowing into the City's storm drain system, which ultimately flows to the Santa Ana <br />River. <br />FINANCIAL IMPACT: <br />Funding for the missing link project is in the FY99-00 Budget, Stormwater Capital Improvements Account No. <br />722-8200-8215-3890. <br />RECOMMENDATION: <br />Staff recommends that Council award the Missing Link Contract to Matich Corp. in the amount of <br />$133,894.40. <br />Report Prepared By: Lorraine June <br />=99-00missinglink <br />Page 1 of 1 Item #13 <br />
The URL can be used to link to this page
Your browser does not support the video tag.