My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
2003 AGN JAN 21 I07
Colton
>
CITY CLERK
>
City Council Agendas
>
Agenda Packets
>
2000 - 2009
>
2003
>
2003 January 21 Agenda Packet
>
2003 AGN JAN 21 I07
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/24/2014 8:57:34 PM
Creation date
2/20/2014 1:32:50 PM
Metadata
Fields
Template:
General Documents
Created By
avillalba
DocType
General Documents
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Item #7 <br />CITY OF COLTON <br />AGENDA REPORT <br />FOR THE COUNCIL MEETING OF JANUARY 21, 2003 <br />TO: HONORABLE MAYOR AND MEMBERS OF THE CITY COUNCIL <br />FROM: AMER JAKHER P.E., CITY ENGINEER ("v' ft kJ <br />SUBJECT: REQUEST FOR COUNCIL APPROVAL OF CHANGE ORDERS NO. <br />2 AND NO. 3 TO THE MT. VERNON AVENUE STREET <br />IMPROVEMENTS AND LANDSCAPE MEDIANS PROJECT <br />DATE: JANUARY 9, 2003 <br />BACKGROUND: <br />On March 26, 2002, City Council awarded the Contract in the amount of $ 698,600.00 to Terra -Cal <br />Construction Inc. for the Mt. Vernon Avenue Street Improvements and Landscape Medians Project. <br />During construction, it was determined that most of the existing sidewalk on the East and West <br />Side of Mt. Vernon Avenue was in need of removal and replacement, hence additional concrete <br />sidewalk, commercial driveway, A.C. pavement, sewer lateral repairs, mobilization and traffic <br />control along Mt. Vernon Avenue were added to the Project. Additional cost of sewer lateral repairs <br />and removal of driveways are due to existing utilities in conflict with the proposed electrical <br />conduit. The total estimate for these removal and repairs, as submitted by the contractor at the <br />request of the City is $92,980.57. This represents 13 % of the contract price. <br />DISCUSSION/ANALYSIS: <br />The Contractor has completed the work on the sidewalks and handicap ramps as specified in the <br />Contract. City staff held a meeting with the Contractor to discuss the proposed changes. The <br />proposed Change Order, mutually agreed upon by the Engineering Department and the Contractor, <br />were drafted as a result of said meeting. The Change Order number 2 is for an amount of <br />$69,005.37 and Change Order number 3 is for an amount of $23,975.20. The total of Change Order <br />numbers 2 and 3 are $92,980.57. <br />ENVIRONMENTAL IMPACT: <br />The public improvements constructed by this project are Exempt under section 15301 (Existing <br />Facilities) of the California Environmental Quality Act (CEQA). <br />
The URL can be used to link to this page
Your browser does not support the video tag.