My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
2003 AGN MAY 06 I10
Colton
>
CITY CLERK
>
City Council Agendas
>
Agenda Packets
>
2000 - 2009
>
2003
>
2003 May 06 Agenda Packet
>
2003 AGN MAY 06 I10
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/26/2014 3:09:12 PM
Creation date
2/20/2014 1:37:52 PM
Metadata
Fields
Template:
General Documents
Created By
avillalba
DocType
General Documents
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
27
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Item #10 <br />CITY OF COLTON <br />AGENDA REPORT <br />FOR THE CITY COUNCIL MEETING OF MAY 6, 2003 <br />TO: HONORABLE MAYOR AND CITY COUNCIL MEMBERS <br />FROM: AMER JAKHER, P.E., CITY ENGINEER <br />SUBJECT: REQUEST FOR APPROVAL OF FIRST AMENDMENT TO <br />ENGINEERING SERVICES CONTRACT WITH W. J. <br />MCKEEVER, INC. FOR EDA PROJECT NO. 07-01-05132 - <br />CONSTRUCTION OF INFRASTRUCTURE IMPROVEMENTS <br />TO SERVE THE COOLEY RANCH AREA. <br />DATE: APRIL 21, 2003 <br />BACKGROUND: <br />On August 9, 2002, the U.S. Department of Commerce — Economic Development Administration <br />(EDA) approved the request of the City of Colton retaining the services of W. J. McKeever, Inc. <br />("McKeever") (see exhibit "A") to provide engineering services for EDA PROJECT NO. 07-01- <br />05132 (CONSTRUCTION OF INFRASTRUCTURE IMPROVEMENTS TO SERVE THE COOLEY <br />RANCHAREA) for an amount of $14,957.11 (see attached Agreement as exhibit `B"). The scope <br />of work included preparation of bid package and the specifications. East Valley Land Company, the <br />developer of the project, originally hired McKeever as the engineering consultant for this project. <br />After the bidding process, McKeever has continued to serve as the Engineering Consultant for the <br />project. The scope of work includes completion of plans after the project approval of EDA, <br />preparation of documents submitted to the EDA, continued coordination with the City of Riverside <br />for the approval of plans, shop drawings, and specifications for the relocation and upsize of a 42" <br />waterline, revision of plans as required on site, and coordination and response to contractor's <br />technical inquiries. McKeever's proposal to perform all of the above services is not to exceed the <br />amount of $40,000 (see exhibit `C"). To date, McKeever has submitted invoices totaling <br />$17,508.41. <br />ANALYSIS/DISCUSSION: <br />Staff has evaluated McKeever's proposal and has determined that the proposed amount not <br />exceeding $40,000 is reasonable considering the magnitude of the project. This item (Architectural <br />and Engineering fee) is part of the scope of work submitted to EDA. A copy of the proposal will be <br />sent to EDA -Los Angeles Office for evaluation and authorization to include as a change order to the <br />Engineering Contract of McKeever. <br />
The URL can be used to link to this page
Your browser does not support the video tag.