My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
2003 AGN MAY 20 I08
Colton
>
CITY CLERK
>
City Council Agendas
>
Agenda Packets
>
2000 - 2009
>
2003
>
2003 May 20 Agenda Packet
>
2003 AGN MAY 20 I08
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/27/2014 3:24:06 PM
Creation date
2/20/2014 1:40:01 PM
Metadata
Fields
Template:
General Documents
Created By
avillalba
DocType
General Documents
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
43
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
TO: <br />'�Y:�U <br />CITY OF COLTON <br />AGENDA REPORT <br />FOR THE CITY COUNCIL MEETING OF MAY 20, 2003 <br />HONORABLE MAYOR AND CITY COUNCIL MEMBERS <br />AMER JAKHER, P.E., CITY ENGINEER �� <br />Item #8 <br />SUBJECT: AUTHORIZATION REQUEST TO AWARD CONTRACT FOR THE <br />CONSTRUCTION OF CONGRESS STREET PARKING PROJECT IN <br />THE AMOLJNT OF $86,252 TO HARDY AND HARPER, INC. AS <br />THE LOWEST RESPONSIVE AND RESPONSIBLE BIDDER. <br />DATE: <br />MAY 12, 2003 <br />In July of 2001, the City of Colton approved an agreement with FHJ General Parinership, Cutting <br />Edge Supply, Inc. for the exchange of rivo parcels of land. The City's parcel had been used as a <br />pazking lot for the Veteran's Pazk ball field with access off of Congress Street. The Cutting Edge <br />parcel is to become a new City parking lot adjacent to the field on the north and Congress Street to <br />the south. <br />The scope of work of the project includes the construction of 3" thick A.C. pavement, 3' wide <br />concrete inverted gutter, 6" concrete curb, and 4" dia. PVC drainage system with 24"x24" grate <br />inlet catch basin. <br />On April 15, 2003, the City Counci] authorized the request to solicit public bids for this project. <br />The advertisement for public bidding began on April 21, 2003 and the bid opening was conducted <br />on May 12, 2003. Staff received formal proposals from four (4) firms, with their corresponding bid <br />amoimt as follows: <br />L Hardy and Harper, Inc. $ 86,252.00 <br />2. 4-Con Engineenng, Inc. $ 90,956.00 <br />3. Tyner Paving Company $ 93,420.00 <br />4. Matich Corporation $ 114,411.00 <br />
The URL can be used to link to this page
Your browser does not support the video tag.