Laserfiche WebLink
CITY OF COLTON <br />AGENDA REPORT <br />FOR COUNCIL MEETING OF AUGUST 03, 2004 <br />TO: HONORABLE MAYOR AND CITY COUNCIL <br />FROM: Jeannette Olko, Electric Utility General Manager <br />Item #17 <br />SUBJECT: Request for Approval of Professional Services Agreement with <br />Black and Veatch <br />DATE: July 26, 2004 <br />BACKGROUND: <br />The Agua Mansa Power Plant was originally conceived as a combined cycle generating facility, <br />but was built as a simple cycle plant because it was more cost-effective. A combined cycle <br />generating facility will allow the plant to operate more efficiently by reducing the heat rate output of <br />the turbine. This in turn reduces the cost of energy, and enormously helps to optimize the plant. <br />The City of Colton Electric Utility received an unsolicited bid from PARGEN, LLC to build out the <br />Agua Mansa Power Plant to a combined cycle generating facility by adding a second turbine and <br />a heat recovery steam generator. <br />DISC USSI ON/ANALYSIS: <br />The proposal received from PARGEN, LLC offers to design, build, and own a second natural gas <br />turbine and steam turbine sited next to the existing turbine owned by the City. As part of the <br />proposal, and because it is in the best interests of both parties, a technical assessment study <br />needs to be performed to verify costs and performance estimates of the combined cycle plant. <br />Both parties have agreed to share in the costs of the study, and have agreed to enter into a <br />Reimbursement Agreement upon approval by Council. An informal bid was prepared and sent to <br />three vendors. Black and Veatch came back with the lowest bid for the scope of services required. <br />These tasks include providing performance estimates, operation and maintenance cost estimates, <br />permitting assessments, capital cost estimates, project schedule, drawings, and a summary report <br />of the key findings. It is anticipated that this study will take approximately eight weeks to complete. <br />Upon completion of the report, both parties will determine whether or not it is feasible to move <br />forward with the project. <br />FINANCIAL IMPACT: <br />The agreement with Black and Veatch is for an amount not to exceed $50,000. There are funds <br />available in account number 520-8000-8022-2350-0923-000. If the Council approves the <br />Reimbursement Contract with PARGEN, LLC, then the City will be reimbursed for half of the costs <br />of the agreement with Black and Veatch. <br />ENVIRONMENTAL IMPACT: <br />None. <br />CONFLICT OF INTEREST — Gift Disclosure Requirements <br />Black and Veatch Corporation <br />6 Venture, Suite 315 <br />Irvine, CA 92618 <br />President: Len Rodman, CEO <br />Contact: James Butcher, Regional Client Manager <br />