My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
2004 AGN SEP 07 I12
Colton
>
CITY CLERK
>
City Council Agendas
>
Agenda Packets
>
2000 - 2009
>
2004
>
2004 September 07 Agenda Packet
>
2004 AGN SEP 07 I12
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/24/2014 8:53:51 PM
Creation date
2/20/2014 2:35:07 PM
Metadata
Fields
Template:
General Documents
Created By
avillalba
DocType
Agendas
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Item #12 <br />CITY OF COLTON <br />AGENDA REPORT <br />FOR THE CITY COUNCIL MEETING OF SEPTEMBER 7, 2004 <br />TO: HONORABLE MAYOR AND CITY COUNCIL MEMBERS <br />FROM: AMER JAKHER, P.E., CITY ENGINEER ID <br />SUBJECT: AUTHORIZATION REQUEST TO REJECT ALL BIDS AND TO <br />SOLICIT ANOTHER BID FOR THE CONSTRUCTION OF FIRE <br />TRAINING TOWER PROJECT <br />DATE: AUGUST 29, 2004 <br />BACKGROUND: <br />On June 1, 2004, the City Council approved the request to solicit public bids for new steel training <br />tower for Fire Department. The existing Fire Department training tower was originally built in <br />1957, by Fire Department personnel. The structure consists of telephone poles at each corner with <br />three tier platforms with 2x4 and 2x6 construction, attached at 10 -foot intervals. In 1962 the <br />tower was enclosed and windows, doors, and an interior stairway constructed to simulate <br />conditions found in a multi -story structure. The tower was constructed without the benefit of <br />engineered plans, nor reviewed for compliance with existing building codes at that time. <br />On August 12, 2004, staff received formal proposals from two (2) firms, with their corresponding <br />bid amount as follows: <br />1. Horizon CCI Services, Inc. — Anaheim, Ca. $ 220,787.00 <br />2. Meadows Construction Services Inc.- Riverside, Ca. $ 360,462.00 <br />ANALYSIS/DISCUSSION: <br />Subsequent to the bid opening, an unopened bid document was discovered by the City Clerk's <br />office. The bid document was not date and time stamped, therefore it was returned unopened to the <br />bidder, WRG Fire Training Simulation Systems, Inc. of Sherwood, Oregon. On August 25, 2004, <br />the City received a letter from WRG protesting the bid opening, indicating that their Bid <br />Documents (shown on Exhibit A) were received by the City prior to the bid opening deadline. <br />Under the circumstances, staff recommends that the current bids shall be rejected and the Project <br />shall be re advertised. <br />CONFLICT OF INTEREST: <br />None. <br />
The URL can be used to link to this page
Your browser does not support the video tag.