My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
1990 AGN JAN 09 I03
Colton
>
CITY CLERK
>
City Council Agendas
>
Agenda Packets
>
1990 - 1999
>
1990
>
1990 January 09 Adj Agenda Packet
>
1990 AGN JAN 09 I03
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/25/2014 1:47:00 PM
Creation date
2/20/2014 7:03:02 PM
Metadata
Fields
Template:
General Documents
Created By
jshook
DocType
General Documents
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
AGREEMENT RECEIVED JAN ,0 g ogo <br />FOR THE CONSTRUCTION OF <br />HUTTON & LUQUE COMMUNITY CENTERS <br />THIS AGREEMENT is made and entered into this Z� day of <br />19" , by and between <br />61 <br />9' o <br />SHOO BUILDING SYSTEMS, INC. <br />(hereinafter referred to as the "Contractor") and the <br />CITY OF COLTON <br />State of California, (hereinafter referred to as the "City). <br />R E C I T A L S <br />WHEREAS, the City Council approved award of a contract to the <br />Contractor for which records of the proceedings are on file <br />in the Office of the City Clerk and open to public <br />inspection; and, <br />WHEREAS, said works of improvement for which the Contractor <br />was awarded the Contract are set forth herein. <br />NOW, THEREFORE, IT IS MUTUALLY AGREED BY THE PARTIES HERETO <br />AS FOLLOWS: <br />A G R E E M E N T <br />1. That the Contractor, for the consideration mentioned in <br />his proposal, will do and perform in good and workmanlike <br />manner, all the hereinafter mentioned work or improvements, <br />under the direction and to the satisfaction of the City all <br />the work to be done under contract in accordance with the <br />plans, specifications and drawings. <br />2. That the following is a general and abbreviated <br />description of the works of improvement: <br />"The construction of Additions & Alterations for Two Existing <br />community centers together with appurtenances and all other <br />work as shown on the plans and specifications." <br />3. That the Contractor will, at said Contractor's own cost <br />and expense, furnish all necessary materials and labor for <br />said work, and the materials used therein shall comply with <br />the specifications and be to the satisfaction of the City, <br />AND, the Contractor will, within 180 calendar days from the <br />date hereof, complete the said work or improvements and turn <br />same over to the City ready for use and free and discharged <br />of all liens, claims and demands whatsoever. The provisions <br />of Title 1 (Commencing with Section 4200), Chapter 3, <br />AGREEMENT <br />Page 1 <br />ORIGINAL -i-%C h 3 <br />CENTRAL RECORDS <br />Le C <br />FILE NO...�= = '.--..--..--N� <br />
The URL can be used to link to this page
Your browser does not support the video tag.