My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
1994 AGN OCT 04 I19
>
CITY CLERK
>
City Council Agendas
>
Agenda Packets
>
1990 - 1999
>
1994
>
1994 October 4 Agenda Packet
>
1994 AGN OCT 04 I19
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/26/2014 5:05:01 PM
Creation date
2/20/2014 7:36:36 PM
Metadata
Fields
Template:
General Documents
Created By
avillalba
DocType
General Documents
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
28
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF COLTON <br />AGENDA REPORT <br />For Council Meeting of October 4, 1994 <br />TO: Honorable Mayor, City Council, and City Manager <br />FROM: Thomas K. Clarke Electric UtilityDi <br />recto DATE. 09/26/94 <br />SUBJECT: AUTHORIZE ELECTRIC UTILITY DIRECTOR TO ENTER INTO AN <br />ADDED FACILITIES AGREEMENT WITH SOUTHERN CALIFORNIA <br />EDISON COMPANY FOR THIRD 66KV BREAKER AT THE COLTON <br />SUBSTATION <br />BACKGROUND <br />Presently, Southern California Edison Company (SCE) has been providing the electric service to <br />the City of Colton at 66KV with separate breakers for each circuit. These two breakers are <br />adequate to meet present load demand including the proposed county hospital load. The city's <br />electric system has been growing and in the next five years it is expected that the city's electric <br />load demand will require the addition of another breaker to provide adequate system reliability. To <br />provide adequate reliability for a new county hospital, as well as for the city's entire electric <br />system, the Electric Department entered into negotiations with SCE to provide the breaker at their <br />Colton substation. <br />STATEMENT OF THE PROBLEM <br />Department staff have been designing a new substation and transmission line in consideration of <br />the projected load. The city's expected load growth by the years 1998-2000 will require an <br />additional breaker to provide adequate system reliability. Staff, along with its consultant, Black & <br />Veatch, evaluated the present economics and circumstances vs. five years from now, and reached <br />the conclusion that SCE should install a third breaker now. SCE has agreed with the City to <br />provide, install, and maintain the third 66KV breaker at the Colton substation per aided facilities <br />under an integrated operations agreement. <br />ALTERNATIVES <br />None. <br />Page 1 of 2 Item No. Iq <br />
The URL can be used to link to this page
Your browser does not support the video tag.