My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
1994 AGN SEP 06 I30
>
CITY CLERK
>
City Council Agendas
>
Agenda Packets
>
1990 - 1999
>
1994
>
1994 September 06 Agenda Packet
>
1994 AGN SEP 06 I30
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/24/2014 1:14:08 PM
Creation date
2/20/2014 7:36:12 PM
Metadata
Fields
Template:
General Documents
Created By
avillalba
DocType
General Documents
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
C/TY OF COL TON <br />AGENCY REPORT <br />For Council Meeting of September 6. 1994 <br />TO: Honorable Mayor, City Council, and City Manager <br />FROM: Paula Chamberlain, Finance Director ppja <br />(l �1�11��i1CQti'` <br />SUBJECT: AUTHORIZATION TO ISSUE PURCHASE ORDERS FOR VARIOUS PIECES OF <br />HARDWARE FOR THE HEWLETT PACKARD MAINFRAME COMPUTER. <br />BACKGROUND <br />The City has recently issued a Request for Proposal (RFP) for financial software applications to operate <br />on the Hewlett Packard 3000 mainframe computer. In anticipation of the installation of the software, it is <br />necessary to upgrade some of our current hardware. We are requesting these items be purchased in <br />advance of the software due to the long lead time in receiving these items from the vendor. We are <br />requesting the following: <br />Hewlett Parkard reconditioned high speed printer (1200 Ipm) - This will provide better efficiency to our <br />information services operation and free the current 600 line per minute printer to be used in the <br />Finance Department. Finance will then run the majority of their reports in the department, increasing <br />the efficiency of the accounting and utility billing functions. <br />Hard drive (2 gigabyte) - Current hard drives are near capacity and the new software is anticipated to <br />require additional storage space. The extra storage will also be required during data conversion <br />when we must run both systems concurrently. <br />An additional tape backup system for nightly backups (8 gigabyte) - Current data does not fit on one <br />tape drive, thereby requiring staff to expend a greater effort to perform the nightly backup. By <br />purchasing this equipment, it would again increase the efficiency of the operation. <br />ALTERNATIVES <br />We could continue to use our current equipment with the exception of the hard drive. This would reduce <br />the efficiency within the department, slow down some operations, and cause the need of overtime by the <br />Information Services division staff. <br />FINANCIAL IMPACT <br />The Cost of the equipment shall be paid from the Electric Utility Fund and is as follows: <br />Description <br />Reconditioned printer <br />2 gigabyte hard drive <br />8 gigabyte tape back up drive <br />Total <br />Approximate Cost <br />12,960 <br />2,538 <br />3,503 <br />19,001 <br />.� 1u,Amp 3 0 --Owl <br />
The URL can be used to link to this page
Your browser does not support the video tag.