My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
2000 AGN JUL 18 I18
Colton
>
CITY CLERK
>
City Council Agendas
>
Agenda Packets
>
2000 - 2009
>
2000
>
2000 July 18 Agenda Packet
>
2000 AGN JUL 18 I18
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/28/2014 12:27:31 AM
Creation date
2/20/2014 10:20:45 AM
Metadata
Fields
Template:
General Documents
Created By
admin
DocType
Agendas
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
123
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF COLTON <br />AGENDA REPORT <br />For the City Council Meeting of July 18, 2000 <br />TO: HONORABLE MAYOR AND CITY COUNCIL <br />APPROVAL: HENRY T. GARCIA, CITY MANAGER ��+k►, � <br />FROM: THOMAS K. CLARKE, UTILITY DIRECTOR�I�-� <br />SUBJECT: AWARD OF CONTRACT FOR THE CITY HALL HVAC SYSTEM <br />RENOVATION, PHASE I, TO ARROWHEAD MECHANICAL, INC. <br />IN THE AMOUNT $92,293.00. <br />DATE: JULY 10, 2000 <br />BACKGROUND: <br />The HVAC system at City Hall is in need of renovation. Many areas are not adequately cooled. To correct the <br />situation, the Utility Department contracted with Leonard Engineering to design a new HVAC system and to <br />provide specifications and drawings to obtain bids for the City Hall HVAC Renovation, Phase I—Mechanical <br />Construction. <br />DISC U SS IONIANALYS IS: <br />On June 8, 2000, The Utility Department solicited for bids for the City Hall HVAC System Renovation, Phase I. <br />Three prospective bidders attended the Pre-Bid Meeting and Job-Walk at 10:00 A.M., June 22, 2000. Bid opening <br />was held in the Corporate Yard Conference Room on July 6, 2000, at 10:00 A.M. Two bids were received and <br />evaluated. <br />A Bid Analysis is attached showing the prices quoted by each bidder. Both bidders meet the specifications and <br />are qualified to perform the HVAC renovation work. The recommended bidder's price is underlined. <br />ALTERNATIVES: <br />None. <br />FINANCIAL IMPACT: <br />The Utility Department has Public Benefit monies available for this project. Monies are available in Account <br />Number 520-8000-80373890-0107-000. <br />ENVIRONMENTALIMPACT: <br />Renovation of the HVAC system will improve energy efficiency at City Hall. <br />RECOMMENDATION: <br />Staff recommends award of contract for the City Hall HVAC System Renovation, Phase I, to Arrowhead <br />Mechanical, Inc., in the amount of $92,293.00 <br />Report Prepared by: Rebecca Gallegos, Purchasing Assistant <br />Page 1 of 1(wi[h attachment) Item #18 <br />
The URL can be used to link to this page
Your browser does not support the video tag.