My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
GTS and Associates/Missing LInks Project
Colton
>
CITY CLERK
>
City Council Agendas
>
Agenda Packets
>
2000 - 2009
>
2001
>
05/15/2001 6:00 pm
>
CONSENT CALENDAR:
>
CUA/Agreement/GTS and Associates
>
GTS and Associates/Missing LInks Project
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/23/2014 2:11:36 PM
Creation date
2/19/2014 8:56:27 PM
Metadata
Fields
Template:
Agenda Item
Item Number
15
Subject (2)
Approval of GTS and Associates to Design the FY00-01 Missing Links Projects in the Amount of $23,280.
Submitted On
9/30/2003
Submitted By
Sabdi Espinoza
Item Title
GTS and Associates/Missing LInks Project
ATRequest
305
Status (2)
2
Department
City Clerk
Meeting Date
5/15/2001
Meeting Time
6:00:00 PM
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
19
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ri it <br />ry <br />CITY OF COLTON <br />AGENDA REPORT <br />For the Colton Utility Authority Meeting of May 15, 2001 <br />TO: HONORABLE CHAIRPERSON AND UTILITY AUTHORITY MEMBERS <br />APPROVAL: HENRY T. GARCIA, CITY MANAGER ,. <br />FROM: THOMAS K. CLARKE, UTILITIES DIRECTOR <br />SUBJECT: APPROVAL OF GTS AND ASSOCIATES TO DESIGN THE FY00-01 MISSING <br />LINKS PROJECTS IN THE AMOUNT OF $23,280 <br />DATE: MAY 7, 2001 <br />BACKGROUND: <br />The FYOO-01 Stormwater Capital Improvement budget includes funding for the drainage studies <br />and the installation of curbs, gutters, sidewalks, handicap ramps and drive approaches at the <br />following locations: <br />DISTRICT 1 PROJECT: <br />1. NEC Watwood and Grand: 25 L.F. of Missing Curb & Gutter and (1) Handicap Ramp <br />There is curb and gutter on Watwood and on Citrus, but not at the corner. The area is <br />covered in grass and weeds, and does not allow for proper drainage to a catch basin. <br />Work to be performed by the Public Works Department, cost for project to be paid <br />by Stormwater. <br />DISTRICT 2 PROJECTS: <br />200 & 202 Johnston and between 132 & 162 Johnston (south side): 150 L.F. Missing <br />Curb and Gutter; (2) Drive Approaches <br />Work to be performed by the Public Works Department, cost for project to be paid <br />by Stormwater. <br />2. Johnston between Hunter & Flood Control Channel: 25 L.F. Curb & Gutter; (1) Drive <br />Approach; (1) Storm Drain; (1) Cross Gutter; 500 Sq. Ft. Alley Paving <br />145 to 138 Johnston (north side) curb, gutter and driveway double -wide approach and <br />partial paving of alley where water is ponding. Install cross gutter on Johnston @ 8th. <br />Installation of underground storm drain from Hunter Rd. east to Lytle Creek Flood <br />Control Channel. <br />Page 1 of 3 <br />Item #16 <br />
The URL can be used to link to this page
Your browser does not support the video tag.