CITY OF COLTON <br />AGENDA REPORT <br />FOR THE COUNCIL MEETING OF JUNE 19, 2001 <br />TO: HONORABLE MAYOR AND MEMBERS OF THE CITY COUNCIL <br />lz� <br />FROM: Ronald C. Kenny, Director of Parks, Recreation and Family Services <br />SUBJECT: Request approval to issue Notice of Completion for the CDBG Project <br />#104-23202 — Colton Cesar Chavez Park Restroom <br />DATE: JUNE 11, 2001 <br />BACKGROUND: <br />At the City Council Meeting of September 26, 2000, the Contract for the CDBG Project #104- <br />22302 — Colton Cesar Chavez Park Restroom was awarded to Paul D. Wilson, Inc. The existing <br />Cesar Chavez Park restroom was demolished and the new restroom constructed in the same <br />location. The new restroom is approximately fifty percent (50%) larger than the previous <br />structure, with improved lighting, more stalls and a janitor's room to store cleaning supplies. <br />Plans for this reconstruction were based upon the Parks & Recreation Commission's <br />recommendations and were designed by Gary W. Miller Architect & Associates, Inc. of San <br />Bernardino, California. <br />Existing water, sewer and electric connections were utilized in order to keep reconstruction <br />costs at a minimum. The new facility has been constructed with a combination of concrete brick <br />and wood in a style that blends with the park surroundings. Both the exterior and interior of the <br />building have been constructed with materials designed to discourage graffiti; the additional <br />lighting, both inside and outside the structure, has been designed to deter vandalism. <br />ANALYSIS/DISCUSSIO <br />The work of this project has been completed per the Contract Documents and Specifications. <br />The City's Building & Safety Division performed routine inspections throughout the course of the <br />project. The final punch list was prepared for the Contractor by the City's Inspectors, noting any <br />and all items found to be incomplete and/or unacceptable. The punch list was satisfactorily <br />completed as directed and the project was deemed complete and acceptable by the Inspectors. <br />All Change Order Work has been completed, inspected and approved. <br />ENVIRONMENTAL IMPACT: <br />None. <br />Item #9 <br />