My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
AR 020706 Notice of Completion-Fire Training Tower
Colton
>
CITY CLERK
>
City Council Agendas
>
Agenda Packets
>
2000 - 2009
>
2006
>
02/07/2006 6:00 pm
>
CONSENT CALENDAR
>
Notice of Completion
>
AR 020706 Notice of Completion-Fire Training Tower
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/23/2014 6:48:46 PM
Creation date
2/19/2014 9:39:20 PM
Metadata
Fields
Template:
Agenda Item
Item Number
15
Subject (2)
- Approve the Contract Change Order of the Project in the Amount of $4,116 (1.5% of Contract Amount); Authorize the Execution and Recordation of the Notice of Completion for the Fire Training Tower Construction Project.
Submitted On
2/2/2006
Submitted By
Sabdi Espinoza
Item Title
AR 020706 Notice of Completion-Fire Training Tower
ATRequest
599
Status (2)
2
Department
City Clerk
Meeting Date
2/7/2006
Meeting Time
6:00:00 PM
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF COLTON <br />AGENDA REPORT <br />FOR THE CITY COUNCIL MEETING OF FEBRUARY 7, 2006 <br />TO: HONORABLE MAYOR AND CITY COUNCIL MEMBERS <br />FROM: AMER JAKHER, P.E., PW DIRECTOR/CITY ENGINEER <br />SUBJECT: NOTICE OF ACCEPTANCE/COMPLETION FOR THE <br />CONSTRUCTION OF FIRE TRAINING TOWER PROJECT. <br />DATE: JANUARY 25, 2006 <br />BACKGROUND: <br />On November 16, 2004, the City Council authorized the award of contract to Horizons CCI <br />Services, Inc. for construction of the Fire Training Tower located at Fire Station No. 1. The <br />project's scope of work involved the installation of a foundation and construction of an elevated <br />steel structure to include four (4) floor levels, with interior stairs, under a flat roof. This project <br />replaced the old Fire Department Training Tower that was originally built in 1957 by Fire <br />Department personnel. The original tower was constructed without the benefit of engineered <br />plans, nor reviewed for compliance with existing building codes. <br />ANALYSIS/DISCUSSION: <br />The total contract amount of the project is $262,475. At the request of Fire Department staff, <br />additional work was added to the scope for additional safety in the amount of $4,116. The scope <br />of the additional works included adding 12' parapet wall opening, rappelling rail, structural <br />support and safety chains. <br />Horizons CCI Services, Inc. completed the project satisfactorily, in the total amount of $266,591. <br />This amount was 1.50% higher than the contract amount as a result of the requested Change <br />Order listed above. <br />CONFLICT OF INTEREST: <br />Exact Business Name: Horizons CCI Services, Inc. <br />President or equal: Hatem Ibrahim <br />Contact or representative: Kinan Kotrash <br />
The URL can be used to link to this page
Your browser does not support the video tag.