My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
AR 050206 Roquet Paving
Colton
>
CITY CLERK
>
City Council Agendas
>
Agenda Packets
>
2000 - 2009
>
2006
>
05/02/2006 6:00 pm
>
CONSENT CALENDAR
>
Change Order/Roquet Paving
>
AR 050206 Roquet Paving
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/23/2014 7:04:41 PM
Creation date
2/19/2014 10:08:13 PM
Metadata
Fields
Template:
Agenda Item
Item Number
9
Subject (2)
- Approve Change Order No. 1 and 2 for the Valley and Pepper Paving Project in the Amount of $50,407 to Roquet Paving and Approve Notice of Completion for the Valley and Pepper Paving Project.
Submitted On
4/27/2006
Submitted By
Sabdi Espinoza
Item Title
AR 050206 Roquet Paving
ATRequest
774
Status (2)
2
Department
City Clerk
Meeting Date
5/2/2006
Meeting Time
6:00:00 PM
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF COLTON <br />AGENDA REPORT <br />FOR THE CITY COUNCIL MEETING OF MAY 2, 2006 <br />TO: HONORABLE MAYOR AND CITY COUNCIL MEMBERS <br />FROM: AMER JAKHER, P.E., PW DIRECTOR/CITY ENGINEER <br />SUBJECT: APPROVE CHANGE ORDERS NO. 1 & NO.2 TO ROQUET <br />PAVING, INC. IN THE AMOUNT OF $50,407 FOR THE <br />VALLEY AND PEPPER INTERSECTION PAVING PROJECT. <br />DATE: APRIL 25, 2006 <br />BACKGROUND: <br />On February 7, 2005 City Council approved the award of a construction contract to Roquet Paving, <br />Inc. in the amount of $98,000.00 for improvements of intersection of Valley Blvd and Pepper <br />Avenue. Prior to the award of this contract minimal work has been scheduled for this intersection <br />due to the pending Valley Boulevard Realignment and Pepper Widening Project. Due to unusual <br />high surface runoff water and heavy traffic experienced by this intersection the condition of the <br />pavement warranted improvement. <br />ANALYSIS/DISCUSSION: <br />The original scope of work was to grind 2" of asphalt in preparation for the installation of geotextile <br />(petromat) fabric and 2" of asphalt. Due to heavy rain prior to the construction start date there was <br />more damage to the paving north of the intersection on Pepper Avenue. Staff analysis determined it <br />was crucial to extend the construction limits further north on Pepper Avenue. To prevent standing <br />water runoff an 18" reinforced concrete pipe was installed across Valley Boulevard to the existing <br />catch basin in front of Bakers Restaurant. This additional work resulted in two change orders to the <br />original contract in the amount of $50,407.00. <br />ENVIRONMENTAL IMPACT: <br />The proposed public improvements are exempt under Section 15301 of the California <br />Environmental Quality Act (CEQA). <br />CONFLICT OF INTEREST <br />Exact Business Name: Roquet Paving, hie. <br />President or equal: Joe Roquet <br />Contact or representative: Joe Roquet <br />
The URL can be used to link to this page
Your browser does not support the video tag.