My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
AR 060606 Inland Empire Construction - City hall remodel phase II
Colton
>
CITY CLERK
>
City Council Agendas
>
Agenda Packets
>
2000 - 2009
>
2006
>
06/06/2006 06:00 PM
>
CONSENT CALENDAR
>
Change Order/Inland Empire Construction Inc.
>
AR 060606 Inland Empire Construction - City hall remodel phase II
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/23/2014 7:08:31 PM
Creation date
2/19/2014 10:14:57 PM
Metadata
Fields
Template:
Agenda Item
Meeting Date
6/6/2006
Meeting Time
6:00:00 PM
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF COLTON <br />AGENDA REPORT <br />FOR COUNCIL MEETING OF JUNE 6, 2006 <br />TO: HONORABLE MAYOR AND CITY COUNCIL <br />FROM: AMER JAKHER P.E., PW DIRECTOR/CITY ENGINEER <br />SUBJECT: APPROVE FINAL CHANGE ORDER FOR THE CITY HALL <br />REMODEL PHASE II PROJECT TO INLAND EMPIRE <br />CONSTRUCTION, INC., IN THE AMOUNT OF $ 2,580. <br />DATE: May 25, 2006 <br />BACKGROUND: <br />On August 24, 2005, a contract was entered into by the City of Colton and Inland Empire <br />Inc. for the City Hall Remodel Phase II Project. This agreement was awarded in the amount <br />of $24,113. The scope of work is inclusive of the following: construction of the wall frames <br />and T -bar ceiling in the City Hall Police Department. On April 18, 2006, the City Council <br />approved Change Order No. 1 to allow for a change to the construction plans, which <br />originally called for wood studs and was changed to call for metal studs; the change order <br />totaled $1,585. <br />DISCUSSION/ANALYSIS: <br />As part of the City Hall Phase II Remodeling Project, the old Chamber of Commerce <br />Building was annexed into the City Hall building to serve as a mini -gymnasium for Police <br />Department personnel. A change in the original plan and unforeseen changes resulted in a <br />change order to the original contract totaling $2,580.00. <br />At the time when the scope of work was delineated for the contractor all the walls indicated in <br />the plans would be finished with a 5/8 light orange peel texture. The Police Department later <br />requested `wall to post stick -ons' be utilized and a smooth rather than a textured finish be <br />achieved for the interior walls. The contractor has skimmed and pre -coated the requested walls <br />for a smooth finish. Various cleanup work was also completed by the contractor including: <br />drywall lamination to existing block walls, framing to conceal pipe columns, and re -hanging of <br />drywall due to HVAC and other repairs. These changes to the original scope of work total <br />$2,580. Including the Change Order No. 1, $ 1,585, the total contract compensation is $ 28,278. <br />
The URL can be used to link to this page
Your browser does not support the video tag.