My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
1999 AGN MAR 16 I06
Colton
>
CITY CLERK
>
City Council Agendas
>
Agenda Packets
>
1990 - 1999
>
1999
>
1999 March 16 Agenda Packet
>
1999 AGN MAR 16 I06
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/24/2014 5:14:40 PM
Creation date
2/20/2014 2:10:48 PM
Metadata
Fields
Template:
General Documents
Created By
avillalba
DocType
Agendas
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF COLTON <br />AGENDA REPORT <br />FOR COUNCIL MEETING OF MARCH 16 1999 <br />TO: HONORABLE MAYOR AND CITY OUNCIL <br />APPROVAL: HENRY GARCIA, CITY MANAGE <br />FROM: JOHN C. HUTTON, PUBLIC WORKS DIRECTO , <br />a <br />SUBJECT: FINAL ACCEPTANCE f NOTICE OF COMPLETION FOR <br />THE 1998 199 PHASE I PAVEMENT REHABILITATION <br />PROJECT — CONTRACTOR MATICH CORPORATION. <br />DATE: <br />BACKGROUND: <br />March 8, 1999 <br />The 1998 - 1999 Phase 1 Pavement Rehabilitation Project consisted of a 2 <br />cold plane and 2" A.C. overlay, asphalt pothole repairs and rubberized crack <br />sealing on various city wide streets. <br />The Project was approved and awarded to Matich Corporation at an estimated <br />cost of $566,664.40. During the course of the project, eight change orders were <br />necessary, total cost of project $733,330.35. A portion of these change orders <br />was made as a result of rescheduling work from phase If project area to phase I <br />Project area. <br />SUMMARY: <br />The contractor has completed the work as specified in the contract on <br />February 23, 1999. The records indicated that this project was completed within <br />the allowable working days. <br />FINANCIAL IMPACT: <br />This Project is funded by Measure I Funds and Host City Fees. The total <br />amount of the construction contract including change orders is $733,330.35 <br />Item # 6 <br />Page 1 of 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.