My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
2000 AGN JUN 06 I11
Colton
>
CITY CLERK
>
City Council Agendas
>
Agenda Packets
>
2000 - 2009
>
2000
>
2000 June 06 Agenda Packet
>
2000 AGN JUN 06 I11
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/25/2014 1:19:33 AM
Creation date
2/20/2014 2:09:29 PM
Metadata
Fields
Template:
General Documents
Created By
avillalba
DocType
Agendas
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF COLTON <br />AGENDA REPORT <br />FOR the City Council Meeting of June 6, 2000 <br />TO: Honorable Mayor and City C&ncil <br />APPROVAL: Henry T. Garcia, City Manag ��[`� <br />FROM: Thomas K. Clarke, Utility Director --\ <br />SUBJECT: APPROVAL OF PROFESSIONAL SERVICES CONTRACT FOR <br />POWER FACTOR CORRECTION TO POWER ENGINEERS <br />DATE: May 22, 2000 <br />Staff sent out a Request for Proposal (RFP) to solicit proposals for professional services to assist <br />them in improving the system power factor to bring it Gose to unity. <br />DISCUSSION: <br />As a part of the system improvements and to reduce our system losses, we have to collect and <br />analyze the data for the optimum location of capacitor banks throughout the City. This will help in <br />reducing the load on most of the distribution circuits. <br />ANALYSIS <br />Staff sent out the Request for Proposal to five consultants. Out of the five, they received three <br />responses and accepted two proposals: one from Power Engineers and one from Harza <br />Engineering Company. The third response was denied due to an excessive workload with limited <br />resources. The total cost of service through Harza Engineering Company is $44,000 vs. $24,940 <br />through Power Engineers. <br />ALTERNATIVES <br />We can re -issue the RFP and seek new proposals which may require another two to three <br />months from issue of the RFP to the award of the contract. <br />FINANCIAL IMPACT <br />The Power Engineers service contract will cost the City $24,940. Funds are allocated in the <br />1999-00 fiscal year budget account No. 520-8000-8002-2350-0923. After completion of the study, <br />the equipment procurement will be bid out separately. There will be additional costs for material <br />to install the power factor improvement equipment over a period of three years. However, this will <br />improve the system efficiency and reduce the losses over a period of several years. <br />ENVIRONMENTAL IMPACT: None. <br />RECOMMENDATION <br />Staff recommends that the City Council approve the attached power factor correction contract <br />with Power Engineers. <br />Report Prepared by: Nitin Modi, Electrical Engineering Manager <br />Page 1 of 1 (with attachment: Contract with Power Engineers) <br />Item # 11 <br />
The URL can be used to link to this page
Your browser does not support the video tag.