My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
2002 AGN DEC 17 I08
Colton
>
CITY CLERK
>
City Council Agendas
>
Agenda Packets
>
2000 - 2009
>
2002
>
2002 December 17 Agenda Packet
>
2002 AGN DEC 17 I08
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/26/2014 8:28:34 PM
Creation date
2/20/2014 1:18:14 PM
Metadata
Fields
Template:
General Documents
Created By
avillalba
DocType
Agendas
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
29
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Item #8 <br />CITY OF COLTON <br />AGENDA REPORT <br />FOR THE CITY COUNCIL MEETING OF DECEMBER 17, 2002 <br />TO: HONORABLE MAYOR AND CITY COUNCIL MEMBERS <br />FROM: AMER JAKHER, P.E., CITY ENGINEER AT <br />SUBJECT: AUTHORIZATION REQUEST TO AWARD CONSTRUCTION <br />STAKING CONTRACT FOR THE EDA PROJECT NO. 07-01-05132 - <br />CONSTRUCTION OF INFRASTRUCTURE IMPROVEMENTS TO <br />SERVE THE COOLEY RANCH AREA TO W J. MCKEE VER INC. IN <br />THE AMOUNT OF $45,300.00 <br />DATE: DECEMBER 5.2002 <br />BACKGROUND: <br />The EDA PROJECT NO. 07-01-05132 (CONSTRUCTION OF INFRASTRUCTURE <br />IMPROVEMENTS TO SERVE THE COOLEY RANCH AREA) is adjacent to Ashley Furniture site <br />and consists of reconstruction of a portion of two (2) existing streets (East Cooley Drive and South <br />Cooley Drive), construction of two (2) new streets (Drivers World Parkway and Frontage Road), <br />construction of various concrete improvements (curb, gutter, AC berm, sidewalk, handicap ramps, <br />and reinforced box culverts), installation of water and sewer mains and the required laterals, <br />construction of storm drain manholes and pipelines to connect the proposed storm drain system, <br />installation of street light bases, conduits and lines for the electrical system, and relocation of <br />pipelines. The Council awarded the construction contract for this project on October 1, 2002. <br />On September 25, 2002, RFP (Request for Proposal for Construction Staking) was sent out to four <br />(4) Engineering Firms. Staff received formal proposal from three (3) Engineering Firms namely: <br />W. J. McKeever Inc. from Riverside, California <br />L. D. King, hic. from Ontario, California <br />W & H Pacific from Irvine, California <br />ANALYSIS/DISCUSSION: <br />Staff has evaluated proposals and has determined that W. J. McKeever Inc. best meets the <br />qualifications for this work. Copies of the three (3) proposals were sent to Department of Economic <br />Development Administration (EDA -Los Angeles Office) for evaluation and subsequently the City <br />
The URL can be used to link to this page
Your browser does not support the video tag.