My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
AR-CUA Extension on Krieger & Stewart Contract
Colton
>
CITY CLERK
>
City Council Agendas
>
Agenda Packets
>
2000 - 2009
>
2001
>
07/17/2001 6:00 pm
>
CONSENT CALENDAR:
>
CUA/Krieger & Stewart Contract Extension
>
AR-CUA Extension on Krieger & Stewart Contract
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/23/2014 8:20:09 PM
Creation date
2/19/2014 8:57:37 PM
Metadata
Fields
Template:
Agenda Item
Item Number
20
Subject (2)
Approval of Extension of time for the Krieger and Stewart Contract to September 30, 2002, for the Design of the FY00-01 Water and Sewer Lines.
Submitted On
10/23/2003
Submitted By
Sabdi Espinoza
Item Title
AR-CUA Extension on Krieger & Stewart Contract
ATRequest
398
Status (2)
2
Department
City Clerk
Meeting Date
7/17/2001
Meeting Time
6:00:00 PM
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Item #24 <br />CITY OF COLTON <br />AGENDA REPORT <br />For the Colton Utility Authority Meeting of July 17, 2001 <br />TO: COLTON UTILITY AUTHORITY CHAIRPERSON AND MEMBERS <br />FROM: THOMAS K. CLARKE, UTILITY DIRECTOR <br />SUBJECT: APPROVAL OF EXTENSION OF TIME TO THE KRIEGER AND <br />AND STEWART CONTRACT TO SEPTEMBER 30, 2002 FOR THE <br />DESIGN OF THE FY00-01 WATER AND SEWER LINES <br />DATE: JUNE 26, 2001 <br />BACKGROUND: <br />The Water and Sewer Master Plans identified the need to replace lines. The Council/Colton <br />Utility Authority approved a two-year budget, which included the Water and Sewer lines to be <br />replaced. In addition, the lines being replaced are also in project areas scheduled for street <br />overlay. There has been a coordinated effort between the Public Works Department and the <br />Utilities Department to ensure that the water and sewer lines will be replaced prior to the street <br />overlay project. <br />On November 7, 2000 the Colton Utility Authority awarded a contract to Krieger and Stewart for <br />the design of the FY00-01 water and sewer line projects, which included engineering assistance <br />during the construction phase of the projects. The contract was to be completed by June 30, <br />2001. <br />DISCUSSION/ANALYSIS: <br />Staff has delayed the completion of the water and sewer line projects in order to make changes <br />to them. These changes were needed to correct underlying problems, therefore, the <br />completion of the design work has also been delayed. Staff is requesting that the Colton Utility <br />Authority approve an extension of the contract time until September 30, 2002. <br />ENVIRONMENTAL IMPACT: <br />None <br />FINANCIAL IMPACT: <br />There is no additional cost to extend the contract. The original contract cost has already been <br />encumbered in FY00-01. The costs are as follows: 1) Engineering cost for water line <br />replacements is not -to -exceed $70,587 and appropriated in the bond funding for the FY00-01 <br />Water Capital Improvements Budget, account no. 521-8100-8106-3890-1000. 2) Engineering <br />cost for sewer line replacements is $39,463 and appropriated in the Sewer Development <br />Budget, account no. 552-8200-8206-3890. The fee estimates include construction surveying <br />and staking. <br />Page 1 of 2 <br />Item 924 <br />
The URL can be used to link to this page
Your browser does not support the video tag.