My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
1993 AGN APR 06 I24
Colton
>
CITY CLERK
>
City Council Agendas
>
Agenda Packets
>
1990 - 1999
>
1993
>
1993 April 06 Agenda Packet
>
1993 AGN APR 06 I24
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/25/2014 4:22:57 AM
Creation date
2/20/2014 1:11:59 PM
Metadata
Fields
Template:
General Documents
Created By
avillalba
DocType
General Documents
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
TO: <br />CITY OF COLTON <br />AGENDA REPORT <br />For Council Meeting of—#— (P - ?3 <br />Honorable Mayor and City Council <br />FROM: Gary E. <br />SUBJECT- Wastewat <br />Required <br />BACKGROUND: <br />, Public Utilities Director <br />Rate Program and Date: March 10, 1993 <br />Treatment Facilities <br />On February 9, 1993 a workshop was hold to brief the Council on the required wastewater <br />revenues and the treatment facilities for the City of Colton. The required treatment <br />facilities included construction at the existing treatment plant and advanced tertiary <br />treatment facilities, known as RIX at a now location on Ague Mansa Road. <br />These facilities are to bring the City of Colton into compliance with the present Cease and <br />Desist Order from the State Regional Water Quality Control Board. The City of Colton and the <br />City of San Bernardino have been working together, with the assistance of the Santa Ana <br />Watershed Project Authority (SAWPA), to acquire the necessary land to construct the required <br />tertiary treatment facilities. <br />DISCUSSI : <br />At the October 6, 1992 Council meeting, Council authorized staff to work with SAWPA <br />in accomplishing the preliminary design for the RIX facilities and necessary interceptor <br />pipelines. The preliminary design has now been completed and the final design is ready to <br />proceed. Also, all preliminary investigations have been completed for the acquisition of the <br />required land. <br />In order to stay on schedule for compliance with the Cease and Desist order the land <br />acquisition needs to be concluded now and the final design accomplished by the summer of <br />1993. <br />In order for the City of Colton to continue to participate with the design and land <br />acquisition, as well as to obtain construction funding, from either State loans or bond <br />sales, the wastewater rate schedule outlined in the February 9, 1993 report by Krieger and <br />Stewart needs to be adopted by Council. <br />Staff is continuing to work on the most cost effective ways to keep construction costs as low <br />as possible. At this time, the recommended rate schedule not forth in the Krieger and <br />Stewart report (attached rate schedules for Ordinance exhibit) needs to be adopted to allow <br />the City of Colton to provide sewer services in compliance with State and Federal <br />requirements. <br />Attachments: I <br />Page I of 2 Item No— -Z4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.