My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
1990 AGN JUL 17 I07
Colton
>
CITY CLERK
>
City Council Agendas
>
Agenda Packets
>
1990 - 1999
>
1990
>
1990 July 17 Agenda Packet
>
1990 AGN JUL 17 I07
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/26/2014 3:26:14 PM
Creation date
2/20/2014 7:06:03 PM
Metadata
Fields
Template:
General Documents
Created By
avillalba
DocType
General Documents
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
27
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF COLTON <br />AGENDA REPORT <br />For Council Meeting of July 17, 1990 <br />TO: Honorable Mayor and City Council <br />FROM: Edmund F. Sotelo, City Manage <br />SUBJECT: City Council Approval of Change Orders #5 Date: July 10, 1990 <br />and #6 for Hutton/Luque Community Centers <br />Expansion Project <br />BACKGROUND <br />CHANGE ORDER #5 <br />Hutton Community Center - In the parking lot every effort was made <br />to save as many trees as possible. To avoid excessive cutting <br />of roots on a Chinese Elm tree, Staff revised the parking lot plan <br />by deleting a stall and adding additional concrete curbing. <br />Luque Center - The gas service was not properly located by the <br />engineer hired to provide the site plan. Due to code restrictions, <br />gas services cannot be located buried beneath structures. Because <br />the problem was not encountered until Southern California Gas Co. <br />marked the site, the contractor could not include the relocation <br />costs into his bid. <br />Hutton and Luque Community Centers - Extension of the time required <br />due to utility relocation, not located on site plan. <br />CHANGE ORDER #6 <br />Hutton Community Center - A structura•1 pipe column was located <br />at the addition access cut-out in the existing masonry block wall. <br />As this existing structural component was utilized for roof load <br />transfer to the footing, a retrofit was required to maintain the <br />structural intergrity of the existing structure. <br />STATEMENT OF THE PROBLEM <br />The City Council needs to approve Change Orders #5 and #6 to the <br />existing contract as now held with Shook Building Systems, Inc. <br />ALTERNATIVES <br />1. Reject the Change Orders, which then the City can anticipate <br />claims to be file. <br />2. Approve the Change Orders. <br />Attachments: ( 2 ) Change Orders #5 and #6 <br />Page t of2 <br />ORIGINAL' Item No._� <br />CENTRAL RECORDS �v <br />FILL110.A.0.'J..3...................�. <br />
The URL can be used to link to this page
Your browser does not support the video tag.