My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
1994 MIN MARCH 15
Colton
>
CITY CLERK
>
City Council Minutes
>
1991-2000
>
1994
>
1994 MIN MARCH 15
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/25/2014 9:57:58 AM
Creation date
2/20/2014 11:34:53 AM
Metadata
Fields
Template:
General Documents
Created By
admin
DocType
General Documents
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CONSENT CALENDAR <br />(1) Minutes <br />Approval of Regular Meeting held March 1, 1994 as on file <br />in the Office of the City Clerk. (CORRECTED BELOW) <br />(2) PULLED FOR DISCUSSION. <br />(3) Bid <br />Award Bid for Transformers to Pauwels Transformers in the <br />Amount of $9,141.51 and Utility Products in the Amount of <br />$15,406.09. <br />(4) Personnel <br />Approve Resolution for Salary of City Clerk, RESOLUTION <br />NO. R-28-94. <br />(5) MOU/Police <br />Authorization for City Manager to Sign Side Letter <br />Modifying Life Insurance and Grievance Procedure <br />Provisions. <br />(6) Personnel <br />Adopt Revised Job Description for Purchasing Manager. <br />(7) Personnel <br />Approve Extension of Provisional Appointment for Mark <br />Huff, Mechanic's Assistant. <br />(8) Claims <br />Denial of Claims of Tuwina Holt, Amanda Lewis and Sandra <br />Viera. <br />(9) Water <br />Approval to Participate in the Rialto Basin Association. <br />(10) Water <br />Approval of Montgomery Watson as Consulting Engineers to <br />Design the Back-up Generator for the Domecq Pump Station. <br />(11) Sewer <br />Approval of LEMNA Project Contract and Kennedy -Jenks, <br />Consultants' Contract. <br />(12) Notice of Completion <br />Acceptance of Katz Well Project, #PW90-11 as 100% <br />Complete and Authorize the Filing of the Notice of <br />Completion. <br />(13) Notice of Completion <br />Acceptance of the Sewer Line Rehabilitation Project as <br />100% Complete for Phase I and Authorize the Filing of the <br />3 <br />Iy :�. 15 1994 <br />
The URL can be used to link to this page
Your browser does not support the video tag.