Laserfiche WebLink
Electric, Water, Wastewater and Stormwater <br />Utility Director Clarke reported that no rate increase was anticipated for the Electric Unit and <br />noted that the preliminary approval for the 14% rate increase for Wastewater Unit had been <br />factored into the budget. Director Clark said he planned to ask Council to set a Public Hearing, in <br />July, to raise water rates to cover infrastructure and water system improvements. He stated there <br />was an aggressive program developed to maintain the stormwater system and for considerable <br />amount of infrastructure work to improve the curbs and gutters in areas of town where they are <br />non-existent or are in need of dire repair. <br />He identified new budgeted positions: One for Electric Unit to handle marketing and <br />deregulation activities; two for Stormwater Unit; and, one each for Water and Wastewater. <br />Director Clark informed that capital improvement programs had been included in all of the <br />budgets, along with Temporary Salaries for data entry positions to input and implement the GIS <br />system. He declared that the thrust of Electric's capital work was for system improvements in the <br />distribution system and to implement the GIS map program. <br />Discussion followed on the subject of deregulation wherein Director Clark explained the City's <br />holding pattern due to the disappearing market. He said the Department was actively pursuing <br />outside sales, dealing with ESPs, with a limited approach. He said an institution advertising <br />-- package (mailers, television/radio ads and newspaper releases) was paid for and ready to go. He <br />concluded that the plan was to concentrate on specialized services for the outside consumer (large <br />industries that are looking for a small price break) but to spend more money for the existing <br />customer base in town and work with RDA to promote a business attraction incentives to in -fill <br />the City with new load. <br />Notice of Violation and NPDES Program <br />Utility Director Clark reported they had reviewed the Notice of Violation very carefully and <br />provided written response addressing each point raised. The NPDES budget was structured to <br />handle all of those concerns, along with an aggressive time table to comply with the Notice, <br />which would require utilizing existing staff, filling in vacancies required by the Board, provide <br />the maintenance coverage needed, provide inspection and stormdrain repair and inspections <br />requested and inspections for construction and permitting, and which would include Community <br />Development Staff, Public Works Staff and Utility Staff. City Manager Garcia added that a <br />letter, with specific timelines and implementation plan by program, had been prepared for <br />delivery, on Thursday, to Regional Water Control Board, with copies to be forwarded to City <br />Council. <br />Discussion ensued regarding CIP report and repair to Washington Street, from Weir Road to <br />Waterman Avenue. CM/Director Hutton responded it could be included to the overlay projects <br />that would commence upon the approval of the budget. <br />Council Mins June 16, 1998 2 <br />