My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
2002 ORD O-13-02
Colton
>
CITY CLERK
>
City Council Ordinances
>
2000s
>
2001-2010
>
2002
>
2002 ORD O-13-02
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/25/2014 4:12:59 PM
Creation date
2/20/2014 11:32:45 AM
Metadata
Fields
Template:
General Documents
Created By
admin
DocType
Ordinances
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 <br />2 <br />3 <br />4 <br />5 <br />6 <br />7 <br />8 <br />9 <br />10II <br />11' <br />12 <br />13 <br />14 <br />15 <br />16 <br />17 <br />18 <br />19 <br />20 <br />21 <br />22 <br />23 <br />24 <br />25 <br />26 <br />27 <br />28 <br />adding the following: <br />"The Building Official may approve an owner -builder design of a #4 <br />steel reinforcing bars top and bottom to be run continuously in the footings of an exempt <br />structure." <br />9. Section 1922.4 is added to the California Building Code to read as <br />follows: <br />All residential concrete slabs shall be required to provide: <br />(a) wire welded mesh 6" x 6' by 10 gauge; <br />(b) vapor barrier 6 mil.; and <br />(c) for engineered grading, recompaction of all plumbing <br />trenches shall meet adequate compacting <br />requirements as stipulated in the compaction reports <br />and as determined by the Building Official or his/her <br />designee." <br />10. Section 2315.5.6 is added to the California Building Code to read as <br />follows: <br />2315.5.6 Structural Integrity. Shear walls shall be properly <br />connected to their supports and carried up to roofs, through floors and down to <br />foundations. Structural discontinuity shall be justified by analysis and details for shear <br />transfer. Shear walls shall not terminate at unblocked diaphragms or at diaphragms with <br />unsupported panel joints unless justified. <br />Where a shear wall terminates at a diaphragm and is parallel to the <br />diaphragm framing members, a satisfactory shear collector (or framing member) shall be <br />aligned under the shear wall. Transverse full -depth solid blocking shall be provided at <br />not more than four feet on center with a minimum of two lines of blocking at wall edges. <br />Where a shear wall terminates at a diaphragm and is perpendicular <br />to the diaphragm framing members, three lines of continuous full -depth solid blocking <br />shall be provided between the framing members at not more than 24 inches on center <br />under and preferably symmetrical about the longitudinal axis of the shear wall.@ <br />11. Sections 3309.5 of the California Building Code is amended by <br />adding the following paragraph: <br />Geology soils reports shall be recognized for a six month period. <br />After the six month period expires and without activity an upgrade shall occur to the <br />7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.