My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
1990 RES R-05-90
Colton
>
CITY CLERK
>
City Council Resolutions
>
1980-1990
>
1990
>
1990 RES R-05-90
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/25/2014 10:23:51 AM
Creation date
2/20/2014 11:12:29 AM
Metadata
Fields
Template:
General Documents
Created By
admin
DocType
Resolutions
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page No. 42 <br />b. Concrete encasement in all street crossings or as required by <br />the Utility. <br />C. Secondary conductors: <br />(i) Residential service: secondary conductor to residential <br />service will be furnished and installed by the City at the <br />applicants cost. <br />(ii) Other than residential service including apartments, <br />condominiums and townhouses: secondary conductors each with <br />current carrying capacity equal to the size of main panel <br />shall be furnished, installed and maintained by the applicant. <br />11. All conduits are to be cleaned and a pull line installed per Utility <br />specifications. <br />G. Engineering and Plan Check Fees: <br />1. There will be a $15.00 charge for checking for meter relocations and <br />changing services at existing residences. <br />2. A minimum amount of $70.00, and not more than 2% of electrical fees <br />paid by the Developer for line extension, will be charged for plan <br />check and engineering of electrical service, payable at the time of <br />receiving the finished design. <br />ISSUED BY <br />Gale A. Drews Effective by Resolution No. Dated <br />Electric Utilities <br />Director Superseding Resolution No. R-39-88 Dated 7/l/88 <br />
The URL can be used to link to this page
Your browser does not support the video tag.