Laserfiche WebLink
PLANS AND SCHEDULES FOR COMPLIANCE WITH CDO NO. 95-36 <br />INVESTIGATE AND IMPLEMENT <br />PROCEDURES FOR <br />SERVICING CLAERATORS <br />1. Contact Bill Currie for inform- Meeting August 01, 1995 <br />ation on servicing techniques for <br />Claerators 1 and 2. <br />2. Meet with Krieger and Stewart Meeting August 04, 1995 <br />to investigate their knowledge of <br />techniques for servicing <br />Claerators 1 and 2. <br />3. Contact the operators of the Meeting August 04, 1995 <br />City of San Bernardino WWRP <br />and City of Rialto WWTP for <br />advice on servicing Claerators <br />4. Develop a procedure for drain- Meeting August 31, 1995 <br />ing, cleaning and inspecting the <br />Claerators. <br />5. Prepare plans and specifications Consultant contract January 26, 1996 <br />for valve and piping modifications <br />to permit isolation of portions of <br />Claerators I and 2 for draining and <br />for interconnection of all three <br />Secondary Clarifiers for redundancy <br />and flexibility of operation. <br />6. Construct valve and piping mod- Construction contract June 28, 1996 <br />ifications to permit isolation of <br />portions of Claerators 1 and 2 for <br />draining and for interconnection of <br />all three Secondary Clarifiers for <br />redundancy and flexibility of <br />operation. <br />DRAIN, CLEAN, INSPECT <br />AND REPAIR CLAERATORS <br />1. Drain, clean and inspect By WWTP personnel September 30, 1996 <br />claerators. and specialty consult- <br />ants. <br />2. Prepare specifications for Consultant contract. February 28, 1997 <br />needed repairs to Claerators I and <br />2 identified during the inspection <br />and noted in the Title 22 Report. <br />3. Perform needed repairs to Construction contract. August 29, 1997 <br />Claerators 1 and 2. <br />4 <br />