My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
1995 RES R-119-95
Colton
>
CITY CLERK
>
City Council Resolutions
>
1991-2000
>
1995
>
1995 RES R-119-95
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/24/2014 10:59:59 PM
Creation date
2/20/2014 10:18:42 AM
Metadata
Fields
Template:
General Documents
Created By
admin
DocType
Resolutions
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PLANS AND SCHEDULES FOR COMPLIANCE WITH CDO NO. 95-36 <br />INVESTIGATE AND IMPLEMENT <br />PROCEDURES FOR <br />SERVICING CLAERATORS <br />1. Contact Bill Currie for inform- Meeting August 01, 1995 <br />ation on servicing techniques for <br />Claerators 1 and 2. <br />2. Meet with Krieger and Stewart Meeting August 04, 1995 <br />to investigate their knowledge of <br />techniques for servicing <br />Claerators 1 and 2. <br />3. Contact the operators of the Meeting August 04, 1995 <br />City of San Bernardino WWRP <br />and City of Rialto WWTP for <br />advice on servicing Claerators <br />4. Develop a procedure for drain- Meeting August 31, 1995 <br />ing, cleaning and inspecting the <br />Claerators. <br />5. Prepare plans and specifications Consultant contract January 26, 1996 <br />for valve and piping modifications <br />to permit isolation of portions of <br />Claerators I and 2 for draining and <br />for interconnection of all three <br />Secondary Clarifiers for redundancy <br />and flexibility of operation. <br />6. Construct valve and piping mod- Construction contract June 28, 1996 <br />ifications to permit isolation of <br />portions of Claerators 1 and 2 for <br />draining and for interconnection of <br />all three Secondary Clarifiers for <br />redundancy and flexibility of <br />operation. <br />DRAIN, CLEAN, INSPECT <br />AND REPAIR CLAERATORS <br />1. Drain, clean and inspect By WWTP personnel September 30, 1996 <br />claerators. and specialty consult- <br />ants. <br />2. Prepare specifications for Consultant contract. February 28, 1997 <br />needed repairs to Claerators I and <br />2 identified during the inspection <br />and noted in the Title 22 Report. <br />3. Perform needed repairs to Construction contract. August 29, 1997 <br />Claerators 1 and 2. <br />4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.