Laserfiche WebLink
PLANS AND SCHEDULES FOR COMPLIANCE WITH CDO NO. 95-36 <br />PREPARE PLANS AND CONS- <br />Consultant contract or December 31, 1996 <br />for improvements and repairs <br />TRUCTION DOCUMENTS FOR <br />recommended as a result of the <br />depending on the availability <br />VARIOUS IMPROVEMENTS <br />of qualified personnel. <br />transfer of the influent pump station <br />AND REPAIRS IDENTIFIED IN <br />THE TITLE 22 REPORT <br />loads and Plants I and 2 loads to <br />1. Install an in -plant pump station <br />Prepare plans <br />December 31, 1996 <br />to redirect recycled flow around <br />Construction <br />January 02, 1998 <br />the sampling station. <br />2. Upgrade grit removal facility to <br />Prepare plans <br />December 31, 1996 <br />accomodate additional flow, add <br />Construction <br />January 02, 1998 <br />grit removal equipment, cover and <br />install venitlation and air scrubbers. <br />3. Upgrade influent lift station to <br />Prepare plans <br />December 31, 1996 <br />accomodate additional flow and <br />Construction <br />January 02, 1998 <br />convert to direct drive systems. <br />4. Replace Digester No. 1 with new Prepare plans <br />December 31, 1996 <br />larger sludge digester. <br />Construction <br />January 02, 1998 <br />5. Install mixing and heating system Prepare plans <br />December 31, 1996 <br />on Digester No. 2. <br />Construction <br />January 02, 1998 <br />6. Replace sludge drying beds with <br />Prepare plans <br />December 31, 1996 <br />mechanical dewatering facility. <br />Construction <br />January 02, 1998 <br />7. Replace blowers with new units <br />Prepare plans <br />December 31, 1996 <br />which will accomodate expanded <br />Construction <br />January 02, 1998 <br />plant capacity and replace air <br />piping with above ground system. <br />8. Provide additional maintenance <br />Prepare plans <br />December 31, 1996 <br />shops and facilities. <br />construction <br />January 02, 1998 <br />PREPARE PLANS AND <br />CONSTRUCTION DOCUMENTS <br />FOR VARIOUS POWER AND <br />INSTRUMENTATION IMPROVE- <br />MENTS IDENTIFIED IN THE <br />TITLE 22 REPORT <br />1. Perform detailed inspection of The majority of this work can February 28, 1996 <br />all electrical distribution equipment. be performed by City <br />Perform loadflow, short circuit and Electrical Utility Department <br />device coordination studies. staff. <br />2. Perform study of the condition The majority of this work can February 28, 1996 <br />and operational criteria for all cont- be performed by City <br />trots, flow monitors, alarms and tele -Electrical Utility Department <br />metry system. staff. <br />3. Prepare plans and specifications <br />Consultant contract or December 31, 1996 <br />for improvements and repairs <br />Electrical Utility staff <br />recommended as a result of the <br />depending on the availability <br />inspections and studies including <br />of qualified personnel. <br />transfer of the influent pump station <br />loads and Plants I and 2 loads to <br />