My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
1995 RES R-32-95
Colton
>
CITY CLERK
>
City Council Resolutions
>
1991-2000
>
1995
>
1995 RES R-32-95
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/26/2014 4:02:42 PM
Creation date
2/20/2014 10:24:57 AM
Metadata
Fields
Template:
General Documents
Created By
admin
DocType
Resolutions
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
22
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ATTACHMENT 4 <br />APPROVE STAFF RECOMMENDED CHANGES TO THE CUSTOMER SERVICE POLICY, <br />INCLUDING ELECTRIC RATE CHANGES, AND ADOPT RESOLUTION <br />BACKGROUND <br />On June 21, 1994, City Council adopted Resolution Number R-74-94 which approved Staff recommended <br />changes to the Electric Utility Customer Service Policy, including a two-year phased -in increase in electric <br />rates. This included an increase of 3.5% in base rate revenues which became effective for all service <br />rendered on and after July 1, 1994. An additional 3.5% base rate increase was also approved to be <br />effective July 1, 1995. In addition, the Power Cost Adjustment (PCA) in the General Provisions changed <br />from zero to a positive $.00558 per kwh. <br />These changes in base rates generate approximately $720,000 annually. The PCA is expected to increase <br />annual revenues by around $1.3 million at the current rate of $.00558 per kwh. <br />These revenues were required to maintain a break-even financial position of the Electric Utility as of the <br />status of the Electric Utility on June 21, 1994. <br />The financial condition of the Electric Utility has changed significantly since June 21, 1994, and has <br />resulted in a need for Staff to request increased revenues through increases in base rates and the power cost <br />adjustment factor. Since June 21, 1994: <br />1. The cash reserve fund of the Electric Utility has been depleted due to loans made to the General <br />Fund, and <br />2. The issuance of bonds to cover capital construction expenses has been forestalled which is <br />requiring capital construction expenses to be paid from operating expenses rather than bond <br />proceeds <br />The immediate financial impact on the Electric Utility requires Staff to request revenue increases totaling <br />about $1.8 million; $1.1 million of which will be used to develop reserves adequate to ensure that the <br />Colton Electric Utility can pay purchased power bills from suppliers; $700,000 of which will be used to <br />cover an existing cash deficit resulting from capital construction expenses being paid from operating <br />revenues. <br />DISCUSSION/ANALYSIS <br />Rate changes will result in an increase of approximately $1.8 million in revenues as compared with <br />currently approved rates between the proposed effective date of April 3, 1995, and June 30, 1996. Over <br />$500,000 of this increase is expected to occur in the current fiscal year. <br />
The URL can be used to link to this page
Your browser does not support the video tag.