Laserfiche WebLink
10/30/01 <br />CITY OF COLTON <br />MEASURE I FIVE YEAR PLAN 1997 / 2002 <br />YEAR STREET LIMITS IMPROVEMENT COST <br />1997/98 Barton over head Bridge replacement $ 250,000.00 <br />Bridge at AT&SF <br />1997/98 <br />Park and Ride <br />Engineering and <br />$ <br />140,000.00 <br />Washington to Terrace Raod <br />Construction <br />1997/98 <br />Reche Canyon Road <br />Missing link curb & gutter <br />$ <br />58,166.00 <br />Rancho Avenue <br />Remove angle point <br />Engineering <br />55,000.00 <br />1997/98 <br />South Mt. Vernon <br />Engineering, Admin. And <br />$ <br />130,000.00 <br />Reche Canyon <br />Bridge <br />Bridge reconstruction <br />403,000.00 <br />1997/98 <br />Agua Mansa Road <br />Construction <br />$ <br />61,354.00 <br />1997/98 <br />South Mt. Vernon Avenue <br />Rehabilitation of roadway <br />$ <br />50,000.00 <br />Washington to Terrace Raod <br />Engineering <br />Subtotal for 1997/1998 <br />mmmww�1998/99 <br />$ <br />689,520.00 <br />Rancho Avenue <br />Remove angle point <br />$ <br />55,000.00 <br />("M" and 3rd. Street <br />Engineering & construction <br />1998/99 <br />Reche Canyon <br />Construction <br />$ <br />403,000.00 <br />(Missing link curb and gutter) <br />Subtotal for 1998/1999 <br />$ <br />458,000.00 <br />1999/20 <br />Colton Avenue <br />Road widening <br />$ <br />255,000.00 <br />(Mt. Vernon to City limits) <br />construction <br />1999/20 <br />Mill Street bridge <br />Add two lanes <br />$ <br />100,000.00 <br />(Maryland to Bordwell) <br />Engineering <br />1999/2000 1999/2000 PAVEMENT REHAB. <br />2" cold plane and 2" asphalt <br />$ <br />102,503.00 <br />PHASE 1 <br />pavement replacement <br />Subtotal for 1999/2000 <br />$ <br />457,503.00 <br />Five Year 20 Year <br />Transportation <br />for 1997/2002 <br />EXHIBIT A <br />Page 1 <br />