Laserfiche WebLink
g. Cooley Dr. (Mt. Vernon Ave. to Ashley Way) - $311,580 — asphalt grind and <br /> overlay, striping, traffic loops, 10 to 15 years (estimated useful life) — estimated <br /> 2 start of design by Sept. 1, 2023 and project construction completion by June 2024. <br /> 3 h. Iowa Ave. (1-215 to Main St.) - $163,189 —asphalt grind and overlay, striping, <br /> 4 traffic loops; estimated useful life - 10 to 15 years); estimated start of design by <br /> Sept. 1, 2023 and project construction completion by June 2024. <br /> 5 <br /> 6 PASSED, APPROVED AND ADOPTED THIS 16th DAY OF MAY <br /> 7 <br /> 8 <br /> J AVA O <br /> 9 Mayor <br /> 10 <br /> ATTEST: <br /> 11 <br /> 12 X J j". <br /> 13 STEPHANIE M. VARGA <br /> Deputy City Clerk <br /> 14 <br /> 15 <br /> 16 <br /> 17 <br /> 18 <br /> 19 <br /> 20 <br /> 21 <br /> 22 <br /> 23 <br /> 24 <br /> 25 <br /> 26 <br /> 27 <br /> 28 <br />