Laserfiche WebLink
Streets <br />Exhibit C <br />CFD 89-2 Improvements to be Completed by Developer <br />San Bemardino/East of Pepper <br />Const Std 8" curb/gutter <br />Const Std 5' sidewalk <br />Const Std Accessibility Ramp <br />Saw Cut to Clean Edge <br />Match Up AC Pavement 10' <br />Cross Gutter Std T wide <br />Sub -Total <br />Engineering & Construction Staking <br />Contingency <br />Total Project Cost <br />Sidewalks <br />12.8 acre frontage on Pepper <br />4.2 acre frontage on Pepper <br />Tract 15873/Meridian <br />Tract 16025/Meridian <br />Park Basin/Meridian <br />Sub -Total <br />Engineering & Construction Staking <br />Contingency <br />Total Project Cost <br />Landscaping/Pepper Avenue <br />1,320 lineal feet of landscape <br />Engineering/Design/Supervision <br />Total Project Cost <br />TOTAL ALL PROJECTS <br />N <br />V�,C, (t, de <br />tAr--JiC k 1-,.p h <br />Quantity <br />Unit <br />Unit Cost <br />Sub -Total Total <br />$ <br />22,000 <br />644 <br />If <br />$ 15.00 <br />9,660 <br />3,220 <br />sf <br />$ 4.00 <br />12,880 <br />3 <br />ea <br />$1,200.00 <br />3,600 <br />644 <br />If <br />$ 1.00 <br />644 <br />6,440 <br />sf <br />$ 2.00 <br />12,880 <br />400 <br />sf <br />$ 4.00 <br />1,600 <br />41,264 <br />15.0% <br />47,660 <br />15.0% <br />$ 6,190 <br />15.0% <br />$ <br />$ 6,190 <br />5,500 <br />sf <br />$ <br />4.00 <br />$ <br />22,000 <br />1,000 <br />sf <br />$ <br />4.00 <br />$ <br />4,000 <br />1,340 <br />sf <br />$ <br />4.00 <br />$ <br />5,360 <br />1,625 <br />sf <br />$ <br />4.00 <br />$ <br />6,500 <br />2,450 <br />sf <br />$ <br />4.00 <br />$ <br />9,800 <br />$ <br />47,660 <br />15.0% <br />$ <br />7,149 <br />15.0% <br />$ <br />7,149 <br />58,080 sf <br />30% <br />Page 1 <br />$ 2.00 $ 116,160 <br />$ 34,848 <br />53,643 <br />61,958 <br />$ 151,008 <br />$ 266,609 <br />