My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
(15)AR 090407 Design Contract for Missing Links project
Colton
>
CITY CLERK
>
City Council Agendas
>
Agenda Packets
>
2000 - 2009
>
2007
>
09/04/2007 6:00 pm
>
CONSENT CALENDAR
>
Award of an Amendment/Katz, Okitsu and Associates
>
(15)AR 090407 Design Contract for Missing Links project
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/23/2014 6:47:16 AM
Creation date
2/19/2014 11:13:37 PM
Metadata
Fields
Template:
Agenda Item
Item Number
12
Subject (2)
- Approve First Amendment to the Design Contract of Katz, Okitsu and Associates to Include PS&E for "C" Street Missing Links Project, in the Amount of $60,095, Increasing the Total Contract Amount to $115,810.
Submitted On
8/30/2007
Submitted By
Sabdi Espinoza
Item Title
AR 090407 Design Contract for Missing Links project
ATRequest
1686
Status (2)
2
Department
City Clerk
Meeting Date
9/4/2007
Meeting Time
6:00:00 PM
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
28
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ITEM #15 <br />CITY OF COLTON <br />AGENDA REPORT <br />FOR THE CITY COUNCIL MEETING OF SEPTEMBER 4, 2007 <br />TO: HONORABLE MAYOR AND CITY COUNCIL MEMBERS <br />FROM: AMER JAKHER, P.E., CITY ENGINEER/PW DIRECTOR <br />SUBJECT: APPROVE FIRST AMENDMENT TO DESIGN CONTRACT OF <br />KATZ, OKITSU AND ASSOCIATES TO INCLUDE THE DESIGN <br />OF "C" STREET MISSING LINKS PROJECT, IN THE AMOUNT <br />OF $60,095, INCREASING THE TOTAL CONTRACT AMOUNT <br />TO $115,810. <br />DATE: AUGUST 27, 2007 <br />BACKGROUND: <br />C Street is frequently use by motorists trying to avoid trains as it is the only street that has underpass <br />access (east/west) between La Cadena Drive and Pennsylvania Avenue. In addition, the traffic <br />volume along C Street is magnified due to its proximity to the downtown area. As C Street provides <br />accessibility to both Colton High School and Grant Elementary School, pedestrian traffic along this <br />street is primarily composed of student traffic utilizing the portion of C Street between Rancho <br />Avenue and 4th. This portion of "C" Street lacks the following improvements: sidewalk, curb, gutter, <br />handicap ramp, and widening on the south side. The Capital Improvement Program for fiscal year <br />2007/2008 includes the C Street Missing Links Project and identifies available funds for the <br />project's design phase. The needed improvements will enhance the safety of vehicular traffic, <br />pedestrian traffic and resolve existing drainage concerns along this portion of C Street. <br />ANALYSIS/DISCUSSION: <br />To complete the design phase of the C Street Missing Links Project it will be necessary to obtain <br />engineered plans. Staff recommends that the existing design contract awarded by Council on March <br />20, 2007 to Katz, Okitsu and Associates (KOA), in the amount of $55,715, be amended to include <br />engineering design work for the C Street Missing Links Project. The existing contract awarded to <br />Katz, Okitsu and Associates (KOA) was for design of Three South Rancho Traffic Signals and Bus <br />Drop-off Zone at Rogers Elementary School Project; these awarded professional services were <br />formally bid as a non-public project, meeting the bidding requirements set forth in the purchasing <br />ordinance. Adding the design of the C Street Missing Links Project to the existing KOA contract <br />will expedite the completion of PS&E. Staff requests awarding KOA an amendment to their <br />agreement for the design of the C Street Missing Links Project as allowed by Section 3.08.070(c) of <br />the city's purchasing ordinance. <br />
The URL can be used to link to this page
Your browser does not support the video tag.