My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
(10)AR 011507 AGRMT Transtech Engineering
Colton
>
CITY CLERK
>
City Council Agendas
>
Agenda Packets
>
2000 - 2009
>
2008
>
01/15/2008 6:00 pm
>
CONSENT CALENDAR
>
Award of Contracts/Willdan and Transtech Engineering, Inc.
>
(10)AR 011507 AGRMT Transtech Engineering
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/23/2014 4:34:43 AM
Creation date
2/19/2014 11:37:56 PM
Metadata
Fields
Template:
Agenda Item
Item Number
8
Subject (2)
- Authorize the City Manager to: (1) Execute Professional Services Agreement with Willdan and Transtech Engineering in the Amount of $45,000 for each Agreement, with any Non-Substantive Changes Approved by the City Manager, the Risk Manager and the City Attorney; and (2) Approve Increases in Compensation for the Agreements with Willdan and Transtech Engineering as necessary, Not to Exceed an Aggregate Amount of $139,234.56 through FY 2008/2009.
Submitted On
1/10/2008
Submitted By
Espinoza Sabdi
Item Title
AR 011507 AGRMT Transtech Engineering
ATRequest
1929
Status (2)
2
Department
City Clerk
Meeting Date
1/15/2008
Meeting Time
6:00:00 PM
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
18
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EXHIBIT "A" <br />SCOPE OF SERVICES <br />NON-STRUCTURAL PLAN CHECK (CODE COMPLIANCE) <br />Contractor shall: <br />A. Review in accordance with the current California Building Code, the California <br />Plumbing Code, the California Mechanical Code, the Uniform Swimming Pool, Spa <br />and Hot Tub code, and the California Electric Code, as adopted and amended by <br />the City, as follows: <br />1. Building use, occupancy, limitations, egress, and fire protection compliance; <br />2. Plumbing review and analysis of design calculations; <br />3. Mechanical review and analysis of design calculations; <br />4. Electrical review and analysis of load calculations; <br />5. Energy calculations and compliance with State Title 24, CAC; <br />6. Disabled access provisions/compliance with State Title 24, CAC; <br />7. Mobile home accessory structures, per State Title 25, CAC. <br />B. Be certified by the International Conference of Building Officials as a Plans <br />Examiner in accordance with the provisions of Sections 18966 and 18968 of CBSC <br />Health and Safety Code. <br />C. Code Compliance Plan reviewers shall use existing City forms. Reviewers shall <br />maintain written lists of corrections needed to make plans conform to the applicable <br />codes and regulations. <br />D. The work -location is to be the contractor's offices. The plans will be picked up by the <br />contractor from the City of Colton and transported by the contractor to the <br />contractor's office for review. <br />2. STRUCTURAL PLAN CHECK <br />Contractor shall: <br />A. Review plans and engineering calculations/reports in accordance with the Structural <br />Engineering Provisions of the California Building Code and accepted engineering <br />practices. <br />B. Structural plan reviewers shall be registered as architects, civil or structural <br />engineers by the California State Board of Registration for Professional Engineers. <br />Such individuals must also be experienced in the code requirements of structural <br />design. Engineers will be expected to sign and date all structural plans and <br />calculations as "reviewed and approved" as an agent of the Building Official. <br />C. Structural plan reviewers shall use existing City forms and shall maintain written lists <br />of corrections needed to make plans conform to the applicable codes and <br />RVPVB\NGs\529334 A-1 (BBK revised July 2, 2001) <br />
The URL can be used to link to this page
Your browser does not support the video tag.