My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
(8)AR 052008 Impound Yard Phase III project
Colton
>
CITY CLERK
>
City Council Agendas
>
Agenda Packets
>
2000 - 2009
>
2008
>
05/22/2008 06:00 PM
>
CONSENT CALENDAR:
>
Construction Agreement/Roadway Engineering Inc.
>
(8)AR 052008 Impound Yard Phase III project
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/23/2014 6:04:40 PM
Creation date
2/19/2014 11:36:29 PM
Metadata
Fields
Template:
Agenda Item
Item Number
8
Subject (2)
- Authorize the Award of Construction Agreement for the Impound Yard Phase III Project to Roadway Engineering, in the Amount of $101,920.10.
Submitted On
5/15/2008
Submitted By
Sabdi Espinoza
Item Title
AR 052008 Impound Yard Phase III project
ATRequest
2208
Status (2)
2
Department
City Clerk
Meeting Date
5/22/2008
Meeting Time
6:00:00 PM
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
23
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ITEM #g <br />CITY OF COLTON <br />AGENDA REPORT <br />FOR COUNCIL MEETING OF MAY 20, 2008 <br />TO: HONORABLE MAYOR AND CITY COUNCIL <br />FROM: MARITZA TAPIA, INTERIM PUBLIC WORKS DIRECTOR <br />SUBJECT: AUTHORIZE THE AWARD OF CONSTRUCTION AGREEMENT FOR <br />THE IMPOUND YARD PHASE III PROJECT TO ROADWAY <br />ENGINEERING, IN THE AMOUNT OF $101,920.10. <br />DATE: MAY 13, 2008 <br />BACKGROUND: <br />On November 1, 2005, City Council approved the construction of the Police Impound Yard on a <br />City owned lot located along Fogg Street, south of "M" Street. In July 2006, the construction of the <br />Police Impound Yard Phase I and II were completed; Notice of Completion was filed on June 06, <br />2006. These completed phases of the Impound Yard Project have developed approximately two <br />acres of the 3.63 acre parcel upon which the Impound Yard exists. <br />Due to the volume of vehicles the Impound Yard operation is experiencing, it is prudent to complete <br />the Impound Yard Phase III Project. This phase will expand the square footage of the Impound <br />Yard to its parcel lot (0163-232-24-000) boundaries. As designed this project was reviewed and <br />approved by the Planning Commission on January 22, 2008. <br />ANALYSIS/DISCUSSION: <br />The Impound Yard Phase III Project will extend the existing Impound Yard enclosure which <br />currently exists to the parcel lot boundaries. The scope of work required to accomplish this <br />includes: extending the masonry wall along the North and South property lines a total of 315 feet, <br />relocation of 351 feet of existing chain link fencing from the south side of the Impound Yard and <br />enclosing the new extension to the west property line, installation of new asphalt concrete pavement <br />of parking lot area, and construction of new driveway approach and sidewalk along frontage of <br />property. <br />As required by the Purchasing Ordinance Section 3.08.050 (c) this public project was formally bid. <br />Bids were <br />opened on May 1, 2008, as advertised. Staff received the following ten bids: <br />1. <br />Roadway Engineering and Contracting Inc. <br />$101,920.10 <br />2. <br />Hillcrest Contracting. <br />$108,435.00 <br />3. <br />Dalke & Sons Construction, Inc <br />$120,680.00 <br />4. <br />Fleming Environmental Inc. <br />$121,639.00 <br />5. <br />Paul W. Crabtree General Contractor. <br />$122,557.80 <br />6. <br />Trinity Construction. <br />$130,430.50 <br />7/10/03 City Clerk's Office Cb <br />
The URL can be used to link to this page
Your browser does not support the video tag.