ITEM #g <br />CITY OF COLTON <br />AGENDA REPORT <br />FOR COUNCIL MEETING OF MAY 20, 2008 <br />TO: HONORABLE MAYOR AND CITY COUNCIL <br />FROM: MARITZA TAPIA, INTERIM PUBLIC WORKS DIRECTOR <br />SUBJECT: AUTHORIZE THE AWARD OF CONSTRUCTION AGREEMENT FOR <br />THE IMPOUND YARD PHASE III PROJECT TO ROADWAY <br />ENGINEERING, IN THE AMOUNT OF $101,920.10. <br />DATE: MAY 13, 2008 <br />BACKGROUND: <br />On November 1, 2005, City Council approved the construction of the Police Impound Yard on a <br />City owned lot located along Fogg Street, south of "M" Street. In July 2006, the construction of the <br />Police Impound Yard Phase I and II were completed; Notice of Completion was filed on June 06, <br />2006. These completed phases of the Impound Yard Project have developed approximately two <br />acres of the 3.63 acre parcel upon which the Impound Yard exists. <br />Due to the volume of vehicles the Impound Yard operation is experiencing, it is prudent to complete <br />the Impound Yard Phase III Project. This phase will expand the square footage of the Impound <br />Yard to its parcel lot (0163-232-24-000) boundaries. As designed this project was reviewed and <br />approved by the Planning Commission on January 22, 2008. <br />ANALYSIS/DISCUSSION: <br />The Impound Yard Phase III Project will extend the existing Impound Yard enclosure which <br />currently exists to the parcel lot boundaries. The scope of work required to accomplish this <br />includes: extending the masonry wall along the North and South property lines a total of 315 feet, <br />relocation of 351 feet of existing chain link fencing from the south side of the Impound Yard and <br />enclosing the new extension to the west property line, installation of new asphalt concrete pavement <br />of parking lot area, and construction of new driveway approach and sidewalk along frontage of <br />property. <br />As required by the Purchasing Ordinance Section 3.08.050 (c) this public project was formally bid. <br />Bids were <br />opened on May 1, 2008, as advertised. Staff received the following ten bids: <br />1. <br />Roadway Engineering and Contracting Inc. <br />$101,920.10 <br />2. <br />Hillcrest Contracting. <br />$108,435.00 <br />3. <br />Dalke & Sons Construction, Inc <br />$120,680.00 <br />4. <br />Fleming Environmental Inc. <br />$121,639.00 <br />5. <br />Paul W. Crabtree General Contractor. <br />$122,557.80 <br />6. <br />Trinity Construction. <br />$130,430.50 <br />7/10/03 City Clerk's Office Cb <br />