My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
(12)AR 102108 AGRMT Hall & Foreman, Inc.
Colton
>
CITY CLERK
>
City Council Agendas
>
Agenda Packets
>
2000 - 2009
>
2008
>
10/21/2008 6:00 pm
>
CONSENT CALENDAR:
>
Agreement/Hall & Foreman, Inc
>
(12)AR 102108 AGRMT Hall & Foreman, Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/23/2014 5:42:56 AM
Creation date
2/20/2014 12:07:08 AM
Metadata
Fields
Template:
Agenda Item
Item Number
11
Subject (2)
- Hall & Foreman, Inc. Additional Services Authorization request regarding West Valley Super Block Specific Plan.
Submitted On
10/16/2008
Submitted By
Sabdi Espinoza
Item Title
AR 102108 AGRMT Hall & Foreman, Inc.
ATRequest
2489
Status (2)
2
Department
City Clerk
Meeting Date
10/21/2008
Meeting Time
6:00:00 PM
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
24
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
To: City of Colton Project Number: 11.070645.0002 <br />Economic Development Dept. Job Description: Specific Plan Amendments <br />650 North La Cadena Drive Project Name: West Valley Super Block Specific Plan (WVSP) <br />Colton, CA 92324 <br />Attn: Ms Candace Cassel Date: September 25, 2008 <br />Work to be completed by HFI: <br />6. Provide Perimeter Legal Description of Specific Plan Area for subject project, based on the Master <br />Land Use Plan prepared by JHA. <br />7. Revise the Specific Plan Legal Description to include the proposed school site within the city of <br />Rialto. -- M a .t_ G• 1� 0-1-V <br />8. Review/Synthesize/Coordinate on-site and off-site Drainage Master Plan for the West Valley <br />Specific Plan including Rational Method (peak runoff), Unit Hydrographs (flood volumes), and <br />pipe hydraulics, currently under contract to be prepared by Engineering Resources. <br />The Time and Materials Fees for the services listed above are as follows: <br />The fee for Items 1, 2 & 3 described above is $5,160.00. <br />The fee for Items 4 described above is $6,975.00. <br />The fee for Item 5 described above is $12,000.00 <br />The fee for Item 6 is $6,500.00. <br />The fee for Item 7 described above is $2,500.00.— <br />The <br />2,500.00.--The fee for Item 8 described above is $9,350.00 <br />All title reports to be provided by City. <br />The above services will be invoiced separately, referenced by HFI's Job Number I1.070645.0002 the <br />signifying mark being the 4 -digit – 0002 sub -code. The original Agreement terms are made a part hereof. <br />CONSULTANT: HALL &i FOREMAN, INC. <br />By: <br />Jon Bourgeois, P.E. <br />President / Principal <br />Date <br />AUTHORIZATION: <br />The above specified Additional Services and related Fee are satisfactory and hereby accepted and authorized. <br />CLIENT: CITY OF COLTON <br />Name: Date <br />S:%076451Admin\Contr2cts1070645.0002r ASA 09-25-08.doc Pagc 2 of 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.