My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
(14)AR 102108 Agua Mansa Widening Project Phase I
Colton
>
CITY CLERK
>
City Council Agendas
>
Agenda Packets
>
2000 - 2009
>
2008
>
10/21/2008 6:00 pm
>
CONSENT CALENDAR:
>
Agreement/Imperial Paving Co. Inc.
>
(14)AR 102108 Agua Mansa Widening Project Phase I
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/23/2014 6:32:52 AM
Creation date
2/19/2014 11:55:00 PM
Metadata
Fields
Template:
Agenda Item
Item Number
13
Subject (2)
- Authorize Award of Construction Agreement to Imperial Paving Co. Inc., for the Agua Mansa Widening Project Phase I, in the Amount of $1,299,704.
Submitted On
10/16/2008
Submitted By
Sabdi Espinoza
Item Title
AR 102108 Agua Mansa Widening Project Phase I
ATRequest
2491
Status (2)
2
Department
City Clerk
Meeting Date
10/21/2008
Meeting Time
6:00:00 PM
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ITEM #14 <br />CITY OF COLTON <br />AGENDA REPORT <br />FOR THE CITY COUNCIL MEETING OF OCTOBER 21, 2008 <br />TO: HONORABLE MAYOR AND CITY COUNCIL MEMBERS <br />FROM: MARITZA TAPIA, INTERIM PUBLIC WORKS DIRECTOR <br />SUBJECT: AUTHORIZE AWARD OF A CONSTRUCTION AGREEMENT TO <br />IMPERIAL PAVING CO., INC., FOR THE AGUA MANSA <br />WIDENING PROJECT PHASE I, IN THE AMOUNT OF $1,299,704. <br />DATE: OCTOBER 14, 2008 <br />BACKGROUND: <br />The Agua Mansa Road Widening and Re -alignment Project Phase I is part of the Fiscal Year <br />2008/2009 CIP (Capital Improvement Program). The improvements for this phase of the Agua <br />Mansa Road Widening and Re -alignment Project will commence along Agua Mansa Road from the <br />San Bernardino Flood Control Rialto Channel to Riverside Avenue. The improvements for this <br />phase include re -alignment and widening the road carriageway. The project will install 6" thick <br />aggregate base, 4" thick asphalt (2" thick rubberized over 2" thick conventional asphalt), curb, <br />gutter, striping and signage along this portion of Agua Mansa Road. A fourteen -foot wide painted <br />median will be provided to better control traffic's left turn movement to the RIX Facility and other <br />businesses located in this area. <br />The Plans, Specifications and Construction Estimates for this project have been completed by <br />Engineering Resources of Southern California. This project advertised in local papers and trade <br />journals. The Engineer's Estimate for the Project is $1,566,864.09. <br />ANALYSIS/DISCUSSION: <br />As advertised the bid opening for the Agua Mansa Road Widening Phase I Project took place on <br />Thursday, October 9, 2008. Staff received bids from the following contractors: <br />1. <br />Imperial Paving Co. Inc. <br />$1,299,704.00 <br />2. <br />Hillcrest Contracting <br />$1,376,330.00 <br />3. <br />Griffith Co. <br />$1,380,777.00 <br />4. <br />Vance Corporation <br />$1,383,831.00 <br />5. <br />R.J. Noble Co. <br />$1,387,805.72 <br />6. <br />All American Asphalt <br />$1,415,000.00 <br />7. <br />Hardy & Harper <br />$1,434,000.00 <br />8. <br />Palp, Inc. <br />$1,444,833.00 <br />9. <br />Grand Pacific Contractors Inc. <br />$1,452,559.90 <br />10. Sully -Miller Contracting Co. <br />$1,471,998.50 <br />11. <br />L.D, Anderson Inc <br />$1,488,377.80 <br />12. <br />Cal Prof Engineering <br />$1,489,800.00 <br />
The URL can be used to link to this page
Your browser does not support the video tag.