My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
1993 AGN JUN 01 I07
Colton
>
CITY CLERK
>
City Council Agendas
>
Agenda Packets
>
1990 - 1999
>
1993
>
1993 June 01 Agenda Packet
>
1993 AGN JUN 01 I07
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/24/2014 11:10:50 PM
Creation date
2/20/2014 1:09:48 PM
Metadata
Fields
Template:
General Documents
Created By
avillalba
DocType
General Documents
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Mr. Bob Lavine <br />E-9305058-3 <br />May 21, 1993 <br />Page 2 <br />The cost of the Insituform activity includes a pre and post video of the line, traffic <br />control, bypass of flow, and all materials and labor (except as noted in the following special <br />provisions) for the Insituform installation. <br />1 The City of Colton (City) will perform, or arrange for, all point repairs needed for, all <br />point repairs needed for the Insituform process. No point repairs are anticipated but this <br />will be verified by the project's video inspection. <br />2. The City will provide water for the Insituform process, at no cost to ISW, including a <br />water meter, if required. <br />3. ISW will be installing a structural pipe into the 10" pipes which will handle all loads the <br />existing pipe is handling. <br />4. ISW will provide traffic control for the entire project. This will involve placing the <br />north -bound traffic on Mt. Vernon into the center of the street lane (median strip) and <br />closing off Laurel Ave. east and Hillcrest Ave., at Mt. Vernon Ave. <br />5. No costs have been included for individual business bypasses, if required. This can be <br />negotiated with the City on an as needed basis. <br />6. Due to the 24 hour operation of the Insituform activity, there can be no restrictions on <br />working hours or days. <br />7. All Insituform work for the project will conform to the attached specifications titled <br />"Standard Specifications for the Insituform® Process" dated 9-92. <br />8. Final inspection and approval will be accomplished by a post video of the line provided <br />by ISW. <br />9. Our proposal is based on using Laborers' Local Union 1234 labor rates for this project, <br />which has been _accepted by the State of California as the prevailing wage for the <br />Insituform activity. <br />10. Upon completion of the field work, ISW will issue a 90% invoice to the City for its <br />work, which will be payable in thirty (30) days from the date of installation. Retention <br />will be payable within 60 days. <br />11. This proposal is good through September 1993. <br />
The URL can be used to link to this page
Your browser does not support the video tag.