My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
1995 AGN SEP 19 I04
Colton
>
CITY CLERK
>
City Council Agendas
>
Agenda Packets
>
1990 - 1999
>
1995
>
1995 September 19 Agenda Packet
>
1995 AGN SEP 19 I04
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/27/2014 11:02:58 AM
Creation date
2/20/2014 5:34:46 PM
Metadata
Fields
Template:
General Documents
Created By
avillalba
DocType
General Documents
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
41
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
r <br />Scope of Work Capital Infrastructure Study <br />11. SCOPE OF WORK <br />Note: The following revised scope of work has been developed based upon the <br />understanding of the project as presented in the amended Request For Proposal (RFP), as <br />further interpreted at a meeting held with City staff on August 23, 1995. <br />It is our intent that the work to be done on this project will be responsive to the City's desire <br />to establish a capital infrastructure financing program and related development impact fees <br />structure that can meet the requirements of state law and satisfy the short and long—term <br />funding needs of the City as it looks to the future. <br />Each task outlined below is intended to be consistent with and responsive to the tasks <br />described in the RFP as further discussed with staff. <br />Changes in the task language are identified by notes in bold italics. <br />TASK 1.0 COLLECTION AND ASSESSMENT OF BASELINE DATA <br />1.1 Identify and Review Source Documents <br />There are a number of documents that the City will have that will need to be collected and <br />reviewed as part of the preparation of this study. With regard to land use planning we would <br />anticipate looking at the General Plan and related documents, park master plans, and open <br />space documents that may exist. With regard to public works, existing documents relating <br />to the circulation network, congestion management plan, water systems, waste water sewer <br />systems, storm drains, flood control, public utilities, street lights, traffic signals and the <br />related levels of service standards of the City has already adopted will need to be determined. <br />Existing capital improvement plans will also need to be assessed and evaluated as they relate <br />to the existing and proposed infrastructure system of the City. With regard to the area of <br />public finance, documents within the City's budget including existing fiscal and financial data, <br />County tax agreements, existing assessment districts and redevelopment agency plans will <br />need to be collected and reviewed. <br />1.2 Conduct Field Windshield Survey <br />After the resource documents have been compiled and reviewed the project team will conduct <br />a windshield survey of the City particular emphasis will be focussed on those areas with <br />recognized infrastructure needs. These areas will be determined based on the data received <br />above and feedback from City staff. If appropriate, a City staff representative will be invited <br />to participate with the project team in the windshield survey task. <br />Topping Jaquess Consultants II -1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.