Laserfiche WebLink
��tayor and Council Memb=rs <br />+l�ay 21. 1990 <br />4. The RWQCB is requiring tha caoacity or ihe sewage tre=_;ment <br />plant b� increzsed io a point whic�� will accommodat� tne en;ir� <br />ilow to tha piznt with the planYs larg2st unit out-of-sarvica. <br />Presanily, tha sewage treatm=_nt plant is able to accommodate <br />about 3.9 mgd with the largast unit disabl2d. To accommodai=_ <br />current flows of about 5.2 mgd, the hydraulic capacity ot tha <br />piant must be expanded by 1.3 mgd. The proposed expansion <br />will actually increase the hydraulic capacity by 3.0 mgd, or <br />'1.7 mgd in excess of that requirzd by present flows. Grznd <br />Terrace will not benefit from this additional expansion, 2nd <br />has stated th2t they will never ba 2ble to increasz th=ir tlows <br />bayond 900,000 gallons per day. <br />R�CO�biMENDATION: . <br />S;a�� recommends that Council wzivz the first raading of the attached Ordinance Setting Sewer <br />J3NIC2 Charges afrectiv� July 'i, �990", and approve setting a public hearing for Juna 4, 7990. <br />