Laserfiche WebLink
JUN -23-1997 11:19 P.11 <br />Colton 15 MW <br />Cities are currently fUUY utilizing this transmission Service Contracts to wheel their <br />respective San Juan powm <br />4-5.3 Pacific DC Transmission Service Contract with Cities of Burbank and Pasadena <br />In 1990, Cities entered into a transmission service contract with cities of Burbank and <br />Pasadena on the Pacific DC transmission line to wheel Cities, Idaho power Purchase. The <br />amounts Of this transmission service are as follows: <br />Azusa: <br />3 MW <br />Banning <br />I MW <br />Colton <br />3 AM <br />Cities are currently flully utilizing their respective transmission service entitlement to wheel <br />the IPC power. <br />4.5-4 Transmission Service Contracts with SCE <br />Cities have entered into various transmission service contracts with SCE to wheel the <br />Power from Cities' resources to Cities' delivery point. TO date, Cities have contracted for <br />the following amounts Of transmission from SCE at various points of receipts: <br />Azusa <br />39 MW <br />Banning <br />33 MW <br />Colton <br />48 NM <br />5- Chapter 5 - SHORT and LONG-TERM EtApLEMFNTATION PLAN <br />A"s discussed, Cities are in resource surplus situation in the short term through year 1999 and <br />thereafter Cities are in load and resource balance situation, therefore. Cities do not intend to <br />acquire additional supply-side resources in the next five years. As also mentioned previously, due <br />to California restructuring Cities anticipate that some of Cities, long term resources will have cost <br />18 <br />-1 1- - I- --- � i - -1 - �i T- --, � - - -V - , - - - I <br />