My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
1997 AGN MAY 06 I12
Colton
>
CITY CLERK
>
City Council Agendas
>
Agenda Packets
>
1990 - 1999
>
1997
>
1997 May 06 Agenda Packet
>
1997 AGN MAY 06 I12
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/25/2014 3:57:57 AM
Creation date
2/20/2014 5:35:05 PM
Metadata
Fields
Template:
General Documents
Created By
avillalba
DocType
General Documents
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
M <br />CITY OF COLTON <br />AGENDA REPORT <br />FOR COUNCIL MEETING OF MAY b, 1997 <br />. <br />' S, <br />TO: <br />HONORABLE MAYOR AND CITY COUNCIL <br />0 <br />APPROVAL: <br />MALIK D. FREEMAN, CITY MANAGER <br />FROM: <br />JOHN C. HUTTON, PUBLIC WORKS DIRECTO <br />SUBJECT: <br />ADDENDUM TO AGENDA REPORT FOR THE <br />PROPOSITION 116 BICYCLE LANE PROJECT <br />DATE: <br />MAY 6,1997 <br />BACKGROUND: <br />As requested in the original staff report dated April 24, 1997, this is the forthcoming <br />addendum referenced, as the additional supplemental information. <br />This project was originally $528,000 and intended for the placement of bicycle lanes <br />and paving of Agua Mansa Road, improving existing road conditions. The project was <br />delayed over several years due to a lack of dedication and landowners objections to <br />the project on Agua Mansa Road, Due to these objections the Aqua Mansa portion of <br />the proiect has been dropped, The City Engineer, attended the California <br />Transportation Commission meeting in March, in the interest of preserving the <br />remaining portion of the project. Money allotted for the remaining "City wide" portion of <br />the project was restored and the project scope changed. This was confirmed by letter, <br />Mid April, at which time the plans were revised and released for immediate bid. The <br />rush to move the project is necessary, since the last date to expend money for this <br />project is June 30, 1997. Delay of one City Council Meeting would have made the <br />construction payment impossible to meet by this deadline. <br />SUMMARY: <br />Two bids were received and publicly read at the bid opening of May 5, 1997. The <br />results are tabulated as follows: <br />Bidder <br />Wyatt Construction <br />Matich Corporation <br />Amount of Bid <br />$83,885.20 <br />$38,393.00 <br />I �4 <br />- i - I I - - - T - <br />
The URL can be used to link to this page
Your browser does not support the video tag.