My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
1997 AGN MAY 06 I12
Colton
>
CITY CLERK
>
City Council Agendas
>
Agenda Packets
>
1990 - 1999
>
1997
>
1997 May 06 Agenda Packet
>
1997 AGN MAY 06 I12
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/25/2014 3:57:57 AM
Creation date
2/20/2014 5:35:05 PM
Metadata
Fields
Template:
General Documents
Created By
avillalba
DocType
General Documents
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
�CITY OF COLTON <br />AGENDA REPORT <br />FOR COUNCIL MEETING OF MAY 6, 1997 <br />TO: HONORABLE MAYOR AND CITY COUNCIL <br />APPROVAL: MALIK D. FREEMAN, CITY MANAGE <br />FROM: JOHN C. HUTTON, PUBLIC WORKS DIRECTOR <br />SUBJECT: RECOMMEENDATION FOR SELECTION OF CONTRACTOR <br />FOR THE PROPOSITION 116 BICYCLE LANE PROJECT <br />DATE: APRIL 24, 1997 <br />BACKGROUND: <br />At the Council meeting of March 18, 1997, staff was authorized to proceed with the <br />advertising for Proposition 116 Bicycle Lane Project. This notice and the subject <br />project are on a extremely tight schedule to assure State funding. The bid opening is <br />set for May 5, 1997 at 2:00 p.m. <br />SUMMARY: <br />Due to the time restraint, the results of the bids and staff's recommendation of <br />contractor selection will be provided as a supplemental document prior to the <br />May 6, 1997 Council meeting. <br />FINANCIAL IMPACT: <br />This is a Budget Capital Improvement Project with funding from a State grant in the <br />amount of $172,048, of which $52,045 has already been received for engineering <br />design and project management. The balance of $120,000 is for construction of <br />Signage, Striping and some Pavement Rehabilitation. <br />ENVIRONMENTAL: <br />y s <br />None <br />:a <br />RECOMMENDATION: <br />Staff recommends approval of the Proposition 116 Bicycle Lane Project and award of <br />contract contingent upon the supplemental document of the results of the bids and <br />findings of the lowest responsible bidder. <br />Report prepared by James R. King, Engineering Specialist <br />Item # 12 <br />
The URL can be used to link to this page
Your browser does not support the video tag.