My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
1998 AGN JUL 21 I02
Colton
>
CITY CLERK
>
City Council Agendas
>
Agenda Packets
>
1990 - 1999
>
1998
>
1998 July 21 Agenda Packet
>
1998 AGN JUL 21 I02
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/25/2014 1:23:51 AM
Creation date
2/20/2014 2:15:53 PM
Metadata
Fields
Template:
General Documents
Created By
cityclerk
DocType
General Documents
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF COLTON <br />CIN COUNCIL AGENDA REPORT/ <br />FOR COUNCIL MEETING OF JU1�1998 <br />TO: Honorable Mayor and City Councilmembers <br />APPROVAL: Henry T. Garcia, City Manage <br />FROM: Thomas K. Clarke, Utility Director&____ <br />SUBJECT: Proposed Water Rate Increase <br />DATE: June 25, 1998 <br />For some time, the water utility has been operating on very close margins. Revenues and expenses were <br />closely monitored to assure that the enterprise continued to operate in the black. However, little effort was <br />put forth to prepare a comprehensive financial plan and establish the proper cash flows to allow for <br />needed system improvements and capital additions. These financial requirements for certain components <br />of the water system have now become unavoidable and need to be addressed. <br />On April 3, 1992, Ordinance 0-07-92 was placed in effect setting the water rates for FY91-92, FY92-93, <br />and FY93-94. The third step became effective on July 1, 1993, the last time the rates changed. In the <br />report supporting adoption of the ordinance, were subsequent projections for rate adjustments in FY94-95 <br />and FY95-96. These changes were not ratified at that time due to concerns for the uncertainty of the <br />projections and as a result staff was instructed to submit specific rate requests as those dates drew <br />nearer. However, no formai requests. were presented to Council during the past two fiscal periods even <br />though system needs had been identified. <br />From a simplified approach, the Water Utility has done quite well without any additional rate increases. <br />The revenues have equaled or exceeded the expenditures. Unfortunately, an active capital improvement <br />for system expansion, reliability, and renewal and replacement was absent. This created a situation <br />whereby major components of the water system showed the obvious signs of age and became <br />operationally constrained. Wells, transmission, and storage, along with a coordinated main replacement <br />program, were all put on hold due to the lack of capital improvement funds. Many of these components <br />had already been identified for rehab or replacement in the 1991 Water Master Plan, in a system <br />inspection by the California Department of Health Services, and more recently in the 1998 Water System <br />Master Plan prepared by Krieger and Stewart. <br />The consultant, with considerable input from Staff, has identified approximately $28 million of capital <br />improvements that require attention to enhance or provide for the long-term reliability and deliverability of <br />water on the domestic water system. Their analysis indicates that approximately half of the identified <br />improvements are necessary in the ensuing three-year period. The projects include well additions, <br />construction of transmission mains, new and rehabbed storage facilities, and certain main replacements <br />and upgrades. Much of the work would have to be done under contract, but City personnel would <br />complete some. <br />Item # 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.