My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
1998 AGN JUL 21 I18
Colton
>
CITY CLERK
>
City Council Agendas
>
Agenda Packets
>
1990 - 1999
>
1998
>
1998 July 21 Agenda Packet
>
1998 AGN JUL 21 I18
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/25/2014 1:40:34 PM
Creation date
2/20/2014 2:15:58 PM
Metadata
Fields
Template:
General Documents
Created By
cityclerk
DocType
General Documents
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF COLTON <br />AGENDA REPORT <br />Council Meeting of July 21, 1998 <br />TO: Honorable Mayor and Council Members <br />APPROVAL: Henry T. Garcia, City Manage <br />FROM: Daryl J. Parrish, Assistant City Manager <br />SUBJECT: Extension of Professional Services Agreement with the Arrowhead <br />Management Group (for improvements surrounding the Arrowhead <br />Regional Medical Center) in the Amount of $41,232.85. <br />DATE: July 9, 1998 <br />BACKGROUND: <br />On August 6, 1996, the City of Colton awarded a contract to the Arrowhead <br />Management Group for Design Engineering and Construction Management for Street, <br />Storm Drain, Intersection, and Landscaping Improvements surrounding the Arrowhead <br />Regional Medical Center, (the "Contract"). At the time the Contract was awarded, our <br />best estimation was that the aforementioned improvements were to have been <br />substantially completed by the middle of February. The termination date specified in the <br />Contract was May 31, 1998. On March 3, 1998, the first extension to the Contract was <br />made to extend it through June 30, 1998. <br />DISCUSSION/ANALYSIS: <br />Arrowhead Management Group has requested an extension of the Contract in order to <br />continue uninterrupted project services to close the Medical Center off-site <br />improvement project. This request includes the Arrowhead Management Group <br />extension request in concert with requests for additional compensation for sub - <br />consultants ASL Consulting Engineers and Calwest Geotechnical Consultants for work <br />completed. <br />Arrowhead Management Group <br />The timeframe specified in the Aman Environmental Construction contract is two <br />hundred and one (201) calendar days. As a result of sundry delays in the contractor <br />completing closeout work required by the contract, an extra fifteen working days was <br />needed. This equates to approximately $7000 in project management fees, which <br />must be added to the Arrowhead Management Group Contract. <br />ASL Consulting Engineers <br />Extra survey work was required primarily due to owner added construction and <br />additional work required as a result of the close proximity of the 108 inch storm drain <br />installed during this project with an existing underground electrical line. Of the total <br />$31,395.25 requested, $15,545.00 will be deducted from the contractor's final payment. <br />Item # 18 <br />
The URL can be used to link to this page
Your browser does not support the video tag.