My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
1998 AGN JUL 21 I18
Colton
>
CITY CLERK
>
City Council Agendas
>
Agenda Packets
>
1990 - 1999
>
1998
>
1998 July 21 Agenda Packet
>
1998 AGN JUL 21 I18
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/25/2014 1:40:34 PM
Creation date
2/20/2014 2:15:58 PM
Metadata
Fields
Template:
General Documents
Created By
cityclerk
DocType
General Documents
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of Colton <br />Agenda Report <br />Council Meeting of July 21, 1998 <br />Page 2 <br />After deducting this amount the additional net project cost as a result ASL's extra work <br />will be $15,850.25 <br />Calwest Geotechnical Consultants <br />The additional Calwest request is a result of compaction re -testing for storm drain, <br />sidewalks and curb and gutter. Of the total $2,837.60 charge, $720 will be charged <br />back to the contractor. The total project cost as a result of Calwest's additional work <br />will be $2,117.60. <br />FISCAL IMPACT: <br />The Arrowhead Management Group Design Engineering and Construction <br />Management Agreement is funded by the County of San Bernardino through the <br />Memorandum of Understanding between the County of San Bernardino and the City of <br />Colton. Of the total $41,232.85, $16,265 will be offset by a deduction from the <br />contractor's final payment, approximately $6,000 will be funded by the County and paid <br />back at a later date without interest, (through the MOU loan) and approximately <br />$18,967.85, will be paid for directly by the County of San Bernardino. <br />RECOMMENDATION: <br />Staff recommends that the City Council approve the extension of the contract for <br />Design Engineering and Construction Management Services with the Arrowhead <br />Management Group through August 31, 1998. <br />Attachments <br />
The URL can be used to link to this page
Your browser does not support the video tag.