My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
1998 AGN JUL 21 I18
Colton
>
CITY CLERK
>
City Council Agendas
>
Agenda Packets
>
1990 - 1999
>
1998
>
1998 July 21 Agenda Packet
>
1998 AGN JUL 21 I18
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/25/2014 1:40:34 PM
Creation date
2/20/2014 2:15:58 PM
Metadata
Fields
Template:
General Documents
Created By
cityclerk
DocType
General Documents
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Arrowhead <br />Management <br />Group <br />June 3, 1998 <br />Daryl Parrish <br />Assistant City Manager <br />City of Colton <br />650 North La Cadena Drive <br />Colton, California 92324 <br />Reference: SBCMCRP - Streets, Storm Drain, Intersection Improvements and <br />Landscaping <br />Subject: Proposal to Cover Extra Work for <br />Construction Project Management Services <br />Engineering Design and Survey Services <br />Geotechnical Services <br />Dear Daryl: <br />Arrowhead Management Group ("AMG") is respectfully requesting an extension of our current <br />Construction Project Management contract with the City of Colton in order to continue <br />uninterrupted project services to closeout the project. We are also requesting additional <br />compensation for our Subconsultants ASL Consulting Engineers, Inc. and Calwest Consultants. <br />As you know, our Consulting Services Contract provided for the duration of work to run <br />seventeen and one-half months and was to include eleven months of design and preconstruction <br />activity and six and one-half months of construction activity. When our agreement was <br />executed, the project time was to have been substantially completed by mid February 1998. <br />In February 1998, our contract was extended to cover our services through the end of May <br />1998. As you know, we have stayed within that "not to exceed" fee through the end of May. <br />BACKGROUND: <br />Attached is a log of events (Exhibit "A") covering the period from AMG's original response to <br />the City's Request for Proposal through construction. We have noted our original proposed <br />dates for various milestones to give you some background concerning our work to date. A <br />summary for AMG's request for an extended time frame and acknowledgment by City of Colton <br />of extra work performed by ASL and Calwest is outlined below: <br />ARROWHEAD MANAGEMENT GROUP -190 North Arrowhead Avenue - Suite E - Rialto, California 92376 9 Phone: (909) 873-9660 9 Fax: (909) 873-9661 <br />
The URL can be used to link to this page
Your browser does not support the video tag.