Laserfiche WebLink
4 <br />Land Use and Population Analysis City of Colton Capital Infrastructure Study <br />TABLE 2-13A <br />FUTURE INFRASTRUCTURE COST RECOVERY FEE CALCULATIOI <br />TABLE 2-13B <br />FUTURE INFRASTRUCTURE COST RECOVERY FEE CALCULATION <br />General Plan <br />Category <br />Development <br />Units <br />ERU <br />Factor <br />ERUs <br />Percent <br />Distribution <br />Cost <br />Distribution <br />Unit <br />Cost <br />Residential <br />Single Family <br />Residential <br />Multiple Family <br />Residential <br />Total <br />4,450 <br />3,941 <br />8,391jj <br />1.00 <br />.87 <br />4,450 <br />3,429 <br />7,879 <br />56% <br />44% <br />100% <br />$560,000 <br />$126 <br />$440,000 <br />$112 <br />$1,000,000 <br />Page 2-24 <br />Exhibit "F" <br />