Laserfiche WebLink
Year 2000 Issues for the Electric Utility Industry 7 <br />Interface Terminals <br />Distributed SLC <br />Control Control <br />System System <br />Coordinated <br />system <br />Ce <br />SCADA Process <br />Control c <br />System Leve' <br />Figure 3 - Typical Utility Plant System <br />SOLVING Y2K PROBLEMS <br />Any good approach to addressing and resolving Y2k issues will: <br />1. Assess and catalog inventory of Y2k susceptible components, <br />2. Analyze the inventory for genuine problems, <br />3. Plan the conversion, and <br />4. Implement and remediate the solution. <br />Contingency planning should also be included. These efforts should be prioritized to <br />first address the critical risks. Figure 4 shows the basic elements of <br />TAVA/R. W. Peck, LLC's methodology and tools, and serves as a good model for <br />others. <br />Copyright 1998, TAVA/R. W. BeckLLc <br />All rights reserved. 1TAWA:RW13ECK <br />