My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
1999 AGN JAN 19 I24
Colton
>
CITY CLERK
>
City Council Agendas
>
Agenda Packets
>
1990 - 1999
>
1999
>
1999 January 19 Agenda Packet
>
1999 AGN JAN 19 I24
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/25/2014 1:38:59 PM
Creation date
2/20/2014 2:10:17 PM
Metadata
Fields
Template:
General Documents
Created By
avillalba
DocType
Agendas
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Year 2000 Issues for the Electric Utility Industry 7 <br />Interface Terminals <br />Distributed SLC <br />Control Control <br />System System <br />Coordinated <br />system <br />Ce <br />SCADA Process <br />Control c <br />System Leve' <br />Figure 3 - Typical Utility Plant System <br />SOLVING Y2K PROBLEMS <br />Any good approach to addressing and resolving Y2k issues will: <br />1. Assess and catalog inventory of Y2k susceptible components, <br />2. Analyze the inventory for genuine problems, <br />3. Plan the conversion, and <br />4. Implement and remediate the solution. <br />Contingency planning should also be included. These efforts should be prioritized to <br />first address the critical risks. Figure 4 shows the basic elements of <br />TAVA/R. W. Peck, LLC's methodology and tools, and serves as a good model for <br />others. <br />Copyright 1998, TAVA/R. W. BeckLLc <br />All rights reserved. 1TAWA:RW13ECK <br />
The URL can be used to link to this page
Your browser does not support the video tag.