My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
1999 AGN OCT 05 I17
Colton
>
CITY CLERK
>
City Council Agendas
>
Agenda Packets
>
1990 - 1999
>
1999
>
1999 October 05 Agenda Packet
>
1999 AGN OCT 05 I17
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/25/2014 4:13:09 AM
Creation date
2/20/2014 1:49:13 PM
Metadata
Fields
Template:
General Documents
Created By
avillalba
DocType
Agendas
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DATE: August 30,1999 <br />FROM: DUSTY DAPPEN H:e� <br />ENGINEERING TEC <br />TO: ALL PLAN HOLDERS <br />ADDENDUMI <br />PUBLIC WORKS DEPARTMENT ENGINEERING DIVISION <br />1998-99 PAVEMENT REHABILITATION PROJECT — PHASE 11 <br />EFFECTIVE AUGUST 30,1999 <br />As of August 30, 1999, the following modifications shall be incorporated into the existing Contact Documents and Specifications <br />for the 1999-2000 Pavement Rehabilitation Project <br />Replace Table of Contents, Pg. TC -5 with Revised TC -5. Section numbers were corrected. <br />Replace Table of Contents, Pg, TC 6 with Revised TC -6. Drawing numbers were corrected, <br />Replace Hunts Lane, Cooley Lane and Cooley Drive — Field Measured Quantifies, Pg. A-6, with the attached <br />Revised Pg. A-6. The CP SF & AC TONS Sublotals have been corrected. <br />Replace Paving: FY99-00 WaterlSewer Project — Pennsylvania , Oak & Laurel Grid — Field Measured Quanfifies, <br />Pg. A-10, with the attached Revised Pg. A-10. Norman Road has been removed from this Project The Sublotals <br />have been adjusted to reflect this deletion. <br />Replace Project Totals —Field Measured Quanffties, Pg. A-11 with Revised Pg. A-11. Quantity adjustments. <br />Replace Proposal Bidding Schedule, Pg. B-4 with the attached Revised Pg. B-4. Quantity adjustments. <br />The following paragraph shall be added to the Special Provisions, Section 11.06 Asphalt Concrete — Various <br />Thickness: <br />A weedkilllpreven6on process shall be applied to the cold -planed streets prior to installing the Asphalt Concrete <br />Overlay. Acceptable products shall be those that prevent the growth or regrowth of any vegetafion or plant matter. <br />Product samples and(or Product data sheets to be submitted to the City Engineer for approval prior to initial <br />application. All products shall be applied per manufacturer's recommendations. <br />The PRE-BID CONFERENCE& JOB WALK has been rescheduled to SEPTEMBER 9,1999, at 10:00 <br />A.M. in the City Council Chambers Conference Room <br />The BID OPENING has been rescheduled to SEPTEMBER 21, 1999, at 2:00 P.M. in the City Council <br />Chambers Conference Room. <br />If you have any questions, please contact Dusty Dappen @ (909) 370-5067 or by Fax @ (909) 370-5072. <br />Thank you. <br />A SIGNED COPY OF THIS ADDENDUM MUST BE INCLUDED IN YOUR BID PROPOSAL <br />A <br />Contractor's Signature of Acknowledgment <br />BID SET # 18 <br />
The URL can be used to link to this page
Your browser does not support the video tag.