My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
1999 AGN SEP 07 I10
Colton
>
CITY CLERK
>
City Council Agendas
>
Agenda Packets
>
1990 - 1999
>
1999
>
1999 September 07 Agenda Packet
>
1999 AGN SEP 07 I10
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/24/2014 9:05:13 PM
Creation date
2/20/2014 1:49:35 PM
Metadata
Fields
Template:
General Documents
Created By
avillalba
DocType
Agendas
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
KQiEc,EQ INCORPORATED e ENGINEERING CONSULTANTS <br />T -E WA -Q T 3602 University Ave - Riverside, CA 92501-3380 e Tel 909-684-6900 - Fax 909-684-6986 <br />August 18, 1999 <br />Lorraine June <br />City of Colton <br />Corporate Yard <br />160 South Tenth Street <br />Colton, CA 92324 <br />Subject: Waterline Replacement Project <br />Sewer Line Replacement Project <br />Fee Estimate to Provide Additional Engineering Services <br />312-51.1/52.1 <br />Dear Ms. June <br />As requested, we are submitting an engineering fee estimate to provide additional engineering services for <br />subject project. As discussed, we will provide contract documents (construction drawings and <br />specifications) in accordance with our original proposal for replacement of additional sewer and water <br />facilities as follows: <br />1. Replacement of 350± LF of 8" sewer including reconditioning three manholes along Laurel Street <br />between 8hStreet east of the railroad tracks to Miller Drive (Manhole No. 6-64 to 6-66). <br />2. Replacement of the existing 24" concrete waterline in Citrus Street from Pennsylvania Avenue to <br />8'hStreet, west of the railroad tracks (1,500± LF). In addition, we will determine if a smaller pipe <br />diameter is adequate. <br />3. Replacement of the existing 8" waterline in Laurel Street between the existing pressure reducing <br />valve east of the railroad tracks to Bordwell Avenue (1,400± LF). <br />In addition, we will evaluate (by operation of the City's hydraulic computer model) if replacement of the <br />existing 6" waterline in Olive Street between Pennsylvania Avenue and La Cadena Drive (1,500± LF) is <br />warranted. We understand said waterline is not currently a maintenance problem, but the City will <br />consider replacing it along with the other pipelines if it is undersized. <br />Our estimated fees for providing the services described above are indicated separately for sewer and <br />water on attached Tables 1 and 2. We will complete our services in accordance with the terms and <br />conditions outlined in our original proposal; however, we will require a time extension from the current <br />completion date of September 13, 1999 to September 30, 1999. <br />
The URL can be used to link to this page
Your browser does not support the video tag.